At a glance

EAST CORTEZ is a 115 kV electric substation in Colorado on EMPIRE ELECTRIC ASSN, INC's transmission network, recorded in the HIFLD transmission dataset. 3 transmission lines connect to it. 148 of Colorado's 400 named substations operate in a higher voltage band. The highest-scoring datacenter candidate site within about 25 miles is LOST CANYON in Montezuma County, with a DC Readiness score of 58/100.

EAST CORTEZ is an electric transmission substation in Colorado, on EMPIRE ELECTRIC ASSN, INC's transmission network. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Min voltage35 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership

Line owner (most lines)EMPIRE ELECTRIC ASSN, INC
Coordinates37.3572, -108.5475

Connected transmission lines

Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.

Line IDVoltageOwnerStatusLength
#201749115 kVTRI-STATE G & T ASSN, INC—8.0 mi
#205842115 kVEMPIRE ELECTRIC ASSN, INC—5.9 mi
#21207035 kVEMPIRE ELECTRIC ASSN, INC—15.3 mi

Browse the full transmission-line map →

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of EAST CORTEZ, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near EAST CORTEZ substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LOST CANYONSubstation-AdjacentCOMontezuma County230 kV300 MW4.3 yrs58.3
EAST CORTEZSubstation-AdjacentCOMontezuma County115 kV100 MW4.3 yrs55.3
UNKNOWN205922Substation-AdjacentCOMontezuma County115 kV100 MW4.3 yrs55.1
UNKNOWN205923Substation-AdjacentCOMontezuma County138 kV100 MW4.3 yrs55.1
TAP203978Substation-AdjacentCOMontezuma County115 kV100 MW4.3 yrs54.3
OZ MontezumaGreenfieldCOMontezuma——4.3 yrs54.2
UNKNOWN208065Substation-AdjacentCOMontezuma County138 kV100 MW4.3 yrs53.8
UNKNOWN208050Substation-AdjacentCOMontezuma County115 kV100 MW4.3 yrs53.8

How does EAST CORTEZ compare with other substations in Colorado?

Colorado has 1,214 substation records in HIFLD, of which 400 carry a station name; the rest are unnamed tap points, risers and line ends. 206 named substations in the state are in EAST CORTEZ's 115–229 kV band (52% of named stations). 148 sit in a higher band. 20 named substations in Colorado operate at 345 kV or above. The highest voltage recorded in the state is 345 kV, and the state median is 115 kV.

Who owns the transmission lines at EAST CORTEZ?

The 3 connected lines listed above are owned by TRI-STATE G & T ASSN, INC, EMPIRE ELECTRIC ASSN, INC. Line voltages range from 35 kV to 115 kV. Their combined recorded length is about 29.2 miles.

How do candidate sites near EAST CORTEZ score?

The 8 highest-scoring candidate sites within about 25 miles range from 54 to 58 on the 0–100 DC Readiness scale. They fall in Montezuma County, Montezuma. The Colorado average across 3,428 scored sites is 50.6. 899 of those Colorado sites are classed as substation sites (candidate locations generated at an existing substation).

Frequently asked questions

What voltage is EAST CORTEZ substation?

EAST CORTEZ has a maximum voltage of 115 kV and a minimum of 35 kV. That places it in the 115–229 kV band. The median named US substation in this dataset is 115 kV, so EAST CORTEZ is at the national midpoint.

How many transmission lines connect to EAST CORTEZ substation?

3 transmission lines terminate at or pass through EAST CORTEZ in the HIFLD line data. The connected lines listed here run at 115 kV, 35 kV. Together the listed lines cover about 29.2 miles.

Who owns EAST CORTEZ substation?

HIFLD does not publish substation owners directly. Most of the transmission lines that end at EAST CORTEZ belong to EMPIRE ELECTRIC ASSN, INC, and others to TRI-STATE G & T ASSN, INC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.

Where is EAST CORTEZ substation located?

EAST CORTEZ is in Colorado at 37.3572, -108.5475. The datacenter candidate sites closest to it are in Montezuma County, Montezuma.

Are there datacenter candidate sites near EAST CORTEZ substation?

GridCensus lists at least 8 scored candidate sites within roughly 25 miles of EAST CORTEZ. The highest-scoring is LOST CANYON at 58/100. Across Colorado, the average DC Readiness score is 50.6.

Other 115 kV substations in Colorado

About this data

Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “EAST CORTEZ substation, Colorado”, https://gridcensus.com/substations/colorado/east-cortez-656f4109 (data as of June 29, 2026).

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for EAST CORTEZ substation, Colorado is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.