CEDAR POINT

Substation

Colorado

Max voltage
230
kV

CEDAR POINT is an electric transmission substation in Colorado. It is classified as high-voltage (230 kv) and connects 2 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage230 kV
Min voltage230 kV
Voltage classHigh-voltage (230 kV)
Connected lines2

Ownership & operation

Operator not catalogued for this substation.

Coordinates39.4012, -103.7349

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of CEDAR POINT, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near CEDAR POINT substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
LIMON WIND #1Substation-AdjacentCOElbert County345 kV600 MW4.3 yrs61.4
LIMON WIND #2Substation-AdjacentCOLincoln County345 kV600 MW4.3 yrs61.2
BIG SANDYSubstation-AdjacentCOLincoln County230 kV300 MW4.3 yrs60.4
LINCOLNSubstation-AdjacentCOLincoln County230 kV300 MW4.3 yrs60.4
MISSLE SITESubstation-AdjacentCOArapahoe County345 kV600 MW3.5 yrs60.0
CEDAR POINTSubstation-AdjacentCOElbert County230 kV300 MW4.3 yrs59.5
UNKNOWN204006Substation-AdjacentCOElbert County230 kV300 MW4.3 yrs59.2
LIMONSubstation-AdjacentCOLincoln County115 kV100 MW4.3 yrs56.3

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for CEDAR POINT substation, Colorado is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.