Max voltage
287
kV

SPRINGVILLE is an electric transmission substation in California. It is classified as high-voltage (230 kv) and connects 8 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage287 kV
Min voltage66 kV
Voltage classHigh-voltage (230 kV)
Connected lines8

Ownership & operation

Operator not catalogued for this substation.

Coordinates36.1080, -118.9381

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of SPRINGVILLE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near SPRINGVILLE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
Roll Delano 2BrownfieldCAKern County66 kV2 MW5.7 yrs48.9
OZ TulareGreenfieldCATulare5.7 yrs48.1
OZ TulareGreenfieldCATulare5.7 yrs47.8
RECTORSubstation-AdjacentCATulare County287 kV300 MW8.2 yrs47.2
EC Near Roll Delano 2GreenfieldCAKern5.7 yrs46.6
SPRINGVILLESubstation-AdjacentCATulare County287 kV300 MW8.2 yrs46.4
EC Near Roll Delano 2GreenfieldCAKern5.7 yrs46.2
OZ TulareGreenfieldCATulare5.7 yrs46.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for SPRINGVILLE substation, California. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.