WEST MEMPHIS SUBSTATION is an electric transmission substation in Arkansas. It is classified as extra-high-voltage (500 kv) and connects 5 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage500 kV
Min voltage161 kV
Voltage classExtra-high-voltage (500 kV)
Connected lines5

Ownership & operation

Operator not catalogued for this substation.

Coordinates35.1180, -90.1876

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of WEST MEMPHIS SUBSTATION, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near WEST MEMPHIS SUBSTATION substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
FREEPORTSubstation-AdjacentTNDeSoto County500 kV1,000 MW1.0 yrs74.3
SHELBYSubstation-AdjacentTNTipton County500 kV1,000 MW1.0 yrs74.3
UNKNOWN115609Substation-AdjacentTNCrittenden County500 kV1,000 MW1.0 yrs70.1
OZ ShelbyGreenfieldTNShelby——3.7 yrs67.7
UNKNOWN115618Substation-AdjacentTNShelby County161 kV100 MW1.0 yrs67.4
UNKNOWN115616Substation-AdjacentTNShelby County161 kV100 MW1.0 yrs67.3
UNKNOWN120814Substation-AdjacentTNShelby County161 kV100 MW1.0 yrs67.2
TAP154306Substation-AdjacentTNShelby County161 kV100 MW1.0 yrs67.2

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for WEST MEMPHIS SUBSTATION substation, Arkansas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.