TAP161405
SubstationArkansas · ENTERGY ARKANSAS INC
At a glance
TAP161405 is an electric transmission substation in Arkansas, on ENTERGY ARKANSAS INC's transmission network. It is classified as distribution (69–115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Connected transmission lines
Lines terminating at or passing through this substation, by HIFLD line ID, highest voltage first.
| Line ID | Voltage | Owner | Status | Length |
|---|---|---|---|---|
| #159834 | 69 kV | ENTERGY ARKANSAS INC | IN SERVICE | 1.0 mi |
| #159835 | 69 kV | ENTERGY ARKANSAS INC | IN SERVICE | 0.8 mi |
| #159837 | 69 kV | ENTERGY ARKANSAS INC | IN SERVICE | 4.9 mi |
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of TAP161405, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| OZ Marion | Greenfield | AR | Marion | — | — | 4.3 yrs | 57.7 |
| EC FFE Marion County | Greenfield | AR | Marion County | — | — | 4.3 yrs | 56.1 |
| EC FFE Baxter County | Greenfield | AR | Baxter County | — | — | 4.3 yrs | 55.7 |
| NORFORK | Substation-Adjacent | AR | Baxter County | 161 kV | 100 MW | 4.3 yrs | 55.6 |
| UNKNOWN121235 | Substation-Adjacent | AR | Baxter County | 161 kV | 100 MW | 4.3 yrs | 55.4 |
| UNKNOWN108066 | Substation-Adjacent | AR | Baxter County | 161 kV | 100 MW | 4.3 yrs | 55.4 |
| UNKNOWN107899 | Substation-Adjacent | AR | Baxter County | 161 kV | 100 MW | 4.3 yrs | 55.2 |
| UNKNOWN121233 | Substation-Adjacent | AR | Baxter County | 161 kV | 100 MW | 4.3 yrs | 55.2 |
Who owns the transmission lines at TAP161405?
The 3 connected lines listed above are owned by ENTERGY ARKANSAS INC. Line voltages range from 69 kV to 69 kV. Their combined recorded length is about 6.6 miles.
How do candidate sites near TAP161405 score?
The 8 highest-scoring candidate sites within about 25 miles range from 55 to 58 on the 0–100 DC Readiness scale. They fall in Marion, Marion County, Baxter County. The Arkansas average across 1,651 scored sites is 53.6. 758 of those Arkansas sites are classed as substation sites (candidate locations generated at an existing substation).
Frequently asked questions
What voltage is TAP161405 substation?
TAP161405 has a maximum voltage of 69 kV. That places it in the 69–114 kV band. The median named US substation in this dataset is 115 kV, so TAP161405 is below the national midpoint.
How many transmission lines connect to TAP161405 substation?
3 transmission lines terminate at or pass through TAP161405 in the HIFLD line data. The connected lines listed here run at 69 kV. Together the listed lines cover about 6.6 miles.
Who owns TAP161405 substation?
HIFLD does not publish substation owners directly. Most of the transmission lines that end at TAP161405 belong to ENTERGY ARKANSAS INC. GridCensus derives this from the line data, so confirm ownership with the utility for anything contractual.
Where is TAP161405 substation located?
TAP161405 is in Arkansas at 36.3732, -92.3878. The datacenter candidate sites closest to it are in Marion, Marion County, Baxter County.
Are there datacenter candidate sites near TAP161405 substation?
GridCensus lists at least 8 scored candidate sites within roughly 25 miles of TAP161405. The highest-scoring is OZ Marion at 58/100. Across Arkansas, the average DC Readiness score is 53.6.
More in Arkansas
About this data
Source: HIFLD Electric Substations and Transmission Lines (U.S. Department of Homeland Security), as published June 29, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “TAP161405 substation, Arkansas”, https://gridcensus.com/substations/arkansas/tap161405-677154be (data as of June 29, 2026).
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for TAP161405 substation, Arkansas is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.