Greenfield

Marion County, Arkansas · MISO

DC Readiness
58.3
Good / 100

OZ Marion is a greenfield datacenter candidate site in Marion County, Arkansas, interconnecting through MISO. It screens at 58.3/100 DC Readiness and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneMISO_ARKANSAS
Wholesale LMP$30.14/MWh
Utility commercial rate0.11¢/kWh
UtilityENTERGY ARKANSAS LLCinvestor ownedfavorable to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookFavorable
≈ 1.4 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth136
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXPBluebird Underground Data Center
IXP distance74.3 mi
Fiber providers6
Fiber coverage65.6%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance340.7 mi

Site characteristics

Site typeGreenfield
Land contactMarion County Assessor
Land owner typeprivate
Buildability90.0/100
Land cover (NLCD)Developed, Open Space

Risk & environment

Environmental constraintLow (30/100)
Flood zoneZone X
Water stress (WRI)0.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyPresent
Superfund siteCOCA COLA ENTERPRISES INC
Hazard sub-score52/100
Construction cost index49.7 (avg 100)

Location context

Nearest datacenterBluebird Underground Data Center
DC distance74.3 mi
Nearest rail1.0 mi
Nearest gas pipeline0.6 mi
Nearest fiber route129.4 mi
County hazard (FEMA NRI)Relatively High (38)
DC tax incentiveNo
Commercial electricity10.73¢/kWh
Industrial electricity7.40¢/kWh
Cooling degree days1,900
Heating degree days3,400
Land price / acre$2,692

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track OZ Marion

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
52
Fiber connectivity12%
68
Energy cost10%
89
Water risk7%
84
Natural hazard6%
52
Buildability7%
90
Labor market4%
50
DC cluster4%
20
Land / acreage3%
49
Construction cost3%
100
Gas pipeline2%
98
Tax incentive1%
0
Climate / cooling1%
30

Nearby comparable sites

Other scored datacenter candidate sites in Marion County, ranked by DC Readiness.

Sites near OZ Marion
SiteTypeVoltageCapacityQueue waitScore
EC FFE Marion CountyGreenfield——1.4 yrs56.7
UNKNOWN121832Substation-Adjacent161 kV100 MW2.8 yrs54.4
FLIPPINSubstation-Adjacent161 kV100 MW2.8 yrs54.2
BULL SHOALSSubstation-Adjacent161 kV100 MW2.8 yrs53.9
UNKNOWN107894Substation-Adjacent69 kV50 MW2.8 yrs51.1
Greenfield (UNKNOWN117338 - BULL SHOALS)Greenfield161 kV100 MW2.8 yrs47.6
Mine SiteFormer Mine——2.8 yrs47.6
SpringfieldFederal Excess——2.8 yrs46.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.