RIVERSIDE

Substation

Arizona

Max voltage
kV

RIVERSIDE is an electric transmission substation in Arizona. It is classified as unclassified and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Voltage classUnclassified
Connected lines4

Ownership & operation

Operator not catalogued for this substation.

StateArizona
Coordinates32.7264, -114.6530

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of RIVERSIDE, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near RIVERSIDE substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
NORTH GILASubstation-AdjacentAZYuma County500 kV1,000 MW6.9 yrs59.2
OZ YumaGreenfieldAZYuma5.7 yrs56.0
OZ YumaGreenfieldAZYuma5.7 yrs55.4
OZ YumaGreenfieldAZYuma5.7 yrs53.7
OZ YumaGreenfieldAZYuma5.7 yrs53.0
GILASubstation-AdjacentAZYuma County161 kV100 MW6.9 yrs51.5
DOME TAPSubstation-AdjacentAZYuma County161 kV100 MW6.9 yrs51.5
WELTON MOHAWKSubstation-AdjacentAZYuma County161 kV100 MW6.9 yrs51.4

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for RIVERSIDE substation, Arizona. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.