MURAL

Substation

Arizona

Max voltage
115
kV

MURAL is an electric transmission substation in Arizona. It is classified as sub-transmission (115 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage115 kV
Voltage classSub-transmission (115 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateArizona
Coordinates31.4295, -109.8759

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of MURAL, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near MURAL substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
OZ CochiseGreenfieldAZCochise5.7 yrs56.7
SAN RAFAELSubstation-AdjacentAZCochise County230 kV300 MW6.9 yrs56.4
OZ CochiseGreenfieldAZCochise5.7 yrs54.2
MURALSubstation-AdjacentAZCochise County115 kV100 MW6.9 yrs52.5
OZ CochiseGreenfieldAZCochise5.7 yrs52.3
UNKNOWN302780Substation-AdjacentAZCochise County115 kV100 MW6.9 yrs52.3
RAMSEYSubstation-AdjacentAZSanta Cruz County115 kV100 MW6.9 yrs51.0
UNKNOWN306966Substation-AdjacentAZSanta Cruz County69 kV50 MW6.9 yrs49.1

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for MURAL substation, Arizona. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.