DOS CONDADOS
SubstationArizona
DOS CONDADOS is an electric transmission substation in Arizona. It is classified as high-voltage (230 kv) and connects 4 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.
Voltage & classification
Ownership & operation
Operator not catalogued for this substation.
Nearby datacenter candidate sites
Scored candidate sites within roughly 25 miles of DOS CONDADOS, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| DOS CONDADOS | Substation-Adjacent | AZ | Graham County | 230 kV | 300 MW | 6.9 yrs | 54.7 |
| MORENCI | Substation-Adjacent | AZ | Greenlee County | 230 kV | 300 MW | 6.9 yrs | 54.5 |
| HACKBERRY | Substation-Adjacent | AZ | Graham County | 230 kV | 300 MW | 6.9 yrs | 54.4 |
| EC FFE Graham County | Greenfield | AZ | Graham County | — | — | 5.7 yrs | 50.9 |
| UNKNOWN309814 | Substation-Adjacent | AZ | Greenlee County | 115 kV | 100 MW | 6.9 yrs | 50.1 |
| UNKNOWN300824 | Substation-Adjacent | AZ | Graham County | 69 kV | 50 MW | 6.9 yrs | 48.7 |
| Greenfield (TAP306867 - None) | Greenfield | AZ | Graham County | 230 kV | 300 MW | 6.9 yrs | 48.7 |
| Greenfield (TAP306867 - None) | Greenfield | AZ | Graham County | 230 kV | 300 MW | 6.9 yrs | 48.4 |
Dataset updated . Screening estimates derived from public data sources.
Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.
Go deeper than the public screen
Every site and score for DOS CONDADOS substation, Arizona is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.