Skip to content
Gridcensus

TAP152969

Substation

Alabama

Max voltage
161
kV

TAP152969 is an electric transmission substation in Alabama. It is classified as sub-transmission (138 kv) and connects 3 transmission lines. Substation proximity is one of the strongest speed-to-power signals for siting a datacenter — interconnection distance to an energized, high-voltage bus is often the binding constraint on time-to-energization.

Voltage & classification

Max voltage161 kV
Min voltage161 kV
Voltage classSub-transmission (138 kV)
Connected lines3

Ownership & operation

Operator not catalogued for this substation.

StateAlabama
Coordinates34.7167, -85.9520

Nearby datacenter candidate sites

Scored candidate sites within roughly 25 miles of TAP152969, ranked by DC Readiness. Sites this close to an energized substation carry a strong speed-to-power advantage.

Candidate sites near TAP152969 substation
SiteTypeStateCountyVoltageCapacityQueue waitScore
WIDOWS CREEK 500KVSubstation-AdjacentALDade County500 kV1,000 MW3.9 yrs73.0
BELLEFONTESubstation-AdjacentALJackson County500 kV1,000 MW3.9 yrs68.3
TAP152961Substation-AdjacentALJackson County500 kV1,000 MW3.9 yrs68.0
TAP153404Substation-AdjacentALJackson County500 kV1,000 MW3.9 yrs67.6
NICKAJACK DAMSubstation-AdjacentTNMarion County161 kV100 MW3.9 yrs62.8
JASPERSubstation-AdjacentTNMarion County161 kV100 MW3.9 yrs62.8
TAP152970Substation-AdjacentALMarion County161 kV100 MW3.9 yrs62.6
EC Coal Jackson CountyGreenfieldALJackson County——3.9 yrs62.0

Dataset updated . Screening estimates derived from public data sources.

Substation attributes are derived from public HIFLD / EIA infrastructure data and may lag real-world upgrades or retirements. Voltage and connected-line counts are screening figures — confirm available capacity and interconnection terms directly with the operating utility and ISO.

Go deeper than the public screen

Every site and score for TAP152969 substation, Alabama is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.