Vantage WA12
DatacenteractiveWA
At a glance
Vantage WA12 is a datacenter at 1711 M Street NE, WA 98848. The facility is catalogued at about 124,695 square feet. Among the best-connected interconnection facilities in the area, the closest is H5 Data Centers Quincy, 0.3 miles away, with 2 connected networks.
Where is Vantage WA12 located?
The facility's recorded address is 1711 M Street NE, WA 98848. Washington has 100 catalogued datacenters, the 6th-most of any state.
How large is Vantage WA12?
Vantage WA12 covers about 124,695 square feet. By footprint it ranks 36th of the 78 Washington datacenters with a recorded floor area. The median recorded footprint in Washington is 115,894 square feet, so this facility is close to the typical Washington datacenter.
What network and power infrastructure is near Vantage WA12?
4 PeeringDB interconnection facilities are listed in the surrounding area; of those, the closest is H5 Data Centers Quincy, about 0.3 miles away. The best-connected of them, Intergate.Quincy, has 4 networks present, against a Washington median of 4 networks per facility. 5 other datacenters are listed in the surrounding area (within about half a degree of latitude and longitude). The highest-scoring candidate site nearby is COLUMBIA in Grant County, with a DC Readiness score of 69.1 out of 100 and a 500 kV substation nearby.
Nearby internet exchanges
- Intergate.QuincyQuincy, WA · 4 networks
- Serverfarm TiTAN Moses LakeMoses Lake, WA · 2 networks
- H5 Data Centers QuincyQuincy, WA · 2 networks
- H5 Data Centers Quincy 2/3Quincy, WA · 0 networks
Other datacenters nearby
- Intergate Quincy Data CenterSabey Data Centers · WA
- NTTData Data CenterWA
- H5 Data CenterIntuit · WA
- Yahoo Data CenterYahoo · WA
- CyrusOne QuincyCyrusOne · WA
Nearby datacenter candidate sites
Scored candidate sites near Vantage WA12, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| COLUMBIA | Substation-Adjacent | WA | Grant County | 500 kV | 1,000 MW | 3.5 yrs | 69.1 |
| Wanapum | Brownfield | WA | Grant County | 500 kV | 1,038 MW | 3.5 yrs | 68.2 |
| UNKNOWN206104 | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 3.5 yrs | 66.6 |
| UNKNOWN209155 | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 3.5 yrs | 66.5 |
| TAP206102 | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 3.5 yrs | 66.3 |
| TAP206103 | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 3.5 yrs | 66.2 |
| VANTAGE | Substation-Adjacent | WA | Grant County | 500 kV | 1,000 MW | 3.5 yrs | 65.6 |
| ROCKY FORD | Substation-Adjacent | WA | Grant County | 230 kV | 300 MW | 3.5 yrs | 64.7 |
See something wrong or out of date?
Frequently asked questions
What is the address of Vantage WA12?
Vantage WA12 is located at 1711 M Street NE, WA 98848. Its coordinates are 47.2539, -119.8137.
How big is Vantage WA12?
Vantage WA12 covers about 124,695 square feet. That is the 36th-largest of 78 Washington datacenters with a recorded footprint.
Which internet exchanges and carrier hotels are near Vantage WA12?
GridCensus lists 4 PeeringDB interconnection facilities near Vantage WA12: H5 Data Centers Quincy (0.3 miles, 2 networks); Intergate.Quincy (0.5 miles, 4 networks); H5 Data Centers Quincy 2/3 (0.7 miles, 0 networks).
More datacenters and hubs in Washington
About this data
Source: PNNL datacenter atlas and OpenStreetMap facility records, deduplicated by GridCensus, as published March 7, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Vantage WA12”, https://gridcensus.com/datacenters/vantage-wa12-215147c0 (data as of March 7, 2026).
Dataset updated . Screening estimates derived from public data sources.
Capacity and footprint are catalogued figures from public facility records and may lag operational changes.
Go deeper than the public screen
Every site and score for Vantage WA12, WA is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.