GRHMORXB - Gresham Central Office
DatacenteractiveGresham, OR · Ziply Fiber
GRHMORXB - Gresham Central Office is an operating datacenter facility in Gresham, OR, operated by Ziply Fiber.. Existing datacenter clusters are a strong signal for new development: they confirm power availability, fiber peering, and a permitting precedent — which is why nearby candidate sites often inherit the same speed-to-power advantages.
Nearby internet exchanges
- PTOR1Portland, OR · 69 networks
- EdgeConneX Portland (EDCPOR01)Hillsboro, OR · 25 networks
- Flexential - Portland/Hillsboro 2 (PDX02)Hillsboro, OR · 23 networks
- Stack Infrastructure Portland PORO2Hillsboro, OR · 10 networks
- Clackamas ESD DatacenterCLACKAMAS, OR · 10 networks
Other datacenters nearby
- Digital Realty PDX11 Data CenterDigital Realty · OR
- Digital Realty PDX11 Data CenterDigital Realty · OR
- QTS North HIL3 South BuildingQuality Technology Services · OR
- Stack Infrastructure Portland 2 Data CenterOR
- Flexential Portland - Hillsboro 2Flexential · OR
Nearby datacenter candidate sites
Scored candidate sites near GRHMORXB - Gresham Central Office, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| BPA TROUTDALE | Substation-Adjacent | OR | Multnomah County | 500 kV | 1,000 MW | 1.7 yrs | 78.2 |
| PEARL | Substation-Adjacent | OR | Washington County | 500 kV | 1,000 MW | 1.7 yrs | 78.1 |
| MCLOUGHLIN | Substation-Adjacent | OR | Multnomah County | 230 kV | 300 MW | 1.7 yrs | 74.3 |
| ROSS | Substation-Adjacent | WA | Clark County | 345 kV | 600 MW | 1.7 yrs | 74.1 |
| GRESHAM | Substation-Adjacent | OR | Multnomah County | 230 kV | 300 MW | 1.7 yrs | 73.4 |
| RIVERGATE | Substation-Adjacent | OR | Washington County | 230 kV | 300 MW | 1.7 yrs | 73.1 |
| CARVER | Substation-Adjacent | OR | Multnomah County | 230 kV | 300 MW | 1.7 yrs | 72.6 |
| SIFTON | Substation-Adjacent | WA | Clark County | 230 kV | 300 MW | 1.7 yrs | 72.1 |
Dataset updated . Screening estimates derived from public data sources.
Datacenter records are derived from public facility datasets (PNNL and related sources) and may be incomplete or lag operational changes. Capacity and footprint are catalogued estimates — confirm operator, capacity, and availability directly with the facility.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for GRHMORXB - Gresham Central Office, Gresham, OR. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.