Apple Data Center
DatacenteractiveMesa, AZ · Apple Inc.
Apple Data Center is an operating datacenter facility in Mesa, AZ, operated by Apple Inc.. It spans approximately 1,338,261 square feet. Existing datacenter clusters are a strong signal for new development: they confirm power availability, fiber peering, and a permitting precedent — which is why nearby candidate sites often inherit the same speed-to-power advantages.
Nearby internet exchanges
- PhoenixNAPPhoenix, AZ · 75 networks
- EdgeConneX Phoenix (EDCPHX01)Tempe, AZ · 39 networks
- Digital Realty PHX10 (120 E Van Buren)Phoenix, AZ · 32 networks
- Iron Mountain Data Center - Phoenix (AZP-1)Phoenix, AZ · 30 networks
- CyrusOne PhoenixPhoenix, AZ · 16 networks
Other datacenters nearby
- Meta Data CenterMeta · AZ
- Google Data CenterGoogle · AZ
- Apple Mesa Data CenterApple · AZ
- NTT PH1 DatacenterNTT · Mesa, AZ
- EdgeCore DigitalAZ
Nearby datacenter candidate sites
Scored candidate sites near Apple Data Center, ranked by DC Readiness — useful for evaluating expansion or second-site options in the same power/fiber market.
| Site | Type | State | County | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|---|---|
| Copper Crossing Energy and Research Cent | Brownfield | AZ | Pinal County | 69 kV | 1,779 MW | 5.7 yrs | 67.6 |
| BROWNING | Substation-Adjacent | AZ | Pinal County | 500 kV | 1,000 MW | 6.9 yrs | 64.6 |
| KYRENE | Substation-Adjacent | AZ | Maricopa County | 500 kV | 1,000 MW | 6.9 yrs | 64.2 |
| PINNACLE PEAK APS | Substation-Adjacent | AZ | Maricopa County | 500 kV | 1,000 MW | 6.9 yrs | 63.1 |
| Williams Air Force Base | Brownfield | AZ | Maricopa | 69 kV | 2 MW | 6.9 yrs | 62.2 |
| WARD | Substation-Adjacent | AZ | Maricopa County | 230 kV | 300 MW | 6.9 yrs | 61.5 |
| EC Near Crosscut | Greenfield | AZ | Maricopa | — | — | 5.7 yrs | 60.9 |
| CORBELL | Substation-Adjacent | AZ | Maricopa County | 230 kV | 300 MW | 6.9 yrs | 60.4 |
See something wrong or out of date?
Dataset updated . Screening estimates derived from public data sources.
Datacenter records are derived from public facility datasets (PNNL and related sources) and may be incomplete or lag operational changes. Capacity and footprint are catalogued estimates — confirm operator, capacity, and availability directly with the facility.
Go deeper than the public screen
This page shows a public slice of the GridCensus dataset for Apple Data Center, Mesa, AZ. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.