Skip to content
Gridcensus

UNKNOWN209493

Substation-Adjacent

Sweetwater County, Wyoming · WECC

DC Readiness
51.1
Fair / 100

UNKNOWN209493 is a substation-adjacent datacenter candidate site in Sweetwater County, Wyoming, interconnecting through WECC. It screens at 51.1/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN209493
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

Interconnection outlookConstrained
≈ 5.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait3.5 yrs
Recent queue wait5.5 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPACT Riverton
IXP distance91.8 mi
Fiber providers5
Fiber coverage15.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score90/100

Location context

Nearest datacenterACT Riverton
DC distance91.8 mi
County hazard (FEMA NRI)Very Low (10)
DC tax incentiveYes (no_income_tax)
Commercial electricity11.06¢/kWh
Industrial electricity7.72¢/kWh
Cooling degree days300
Heating degree days7,600
Land price / acre$387

Regulatory climate

Favorablestate posture · as of 2026-08

Low-cost power and land; DC-friendly posture.

DC tax incentiveYes

Incentive detail: No state corporate or personal income tax; low property taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN209493

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
49
Fiber connectivity12%
50
Energy cost10%
50
Water risk7%
48
Natural hazard6%
90
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
55
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Sweetwater County, ranked by DC Readiness.

Sites near UNKNOWN209493
SiteTypeVoltageCapacityQueue waitScore
JIM BRIDGERSubstation-Adjacent345 kV600 MW3.5 yrs59.9
UNKNOWN202468Substation-Adjacent230 kV300 MW3.5 yrs58.0
POINT OF ROCKSSubstation-Adjacent230 kV300 MW3.5 yrs58.0
ROCK SPRINGSSubstation-Adjacent230 kV300 MW3.5 yrs58.0
UNKNOWN202321Substation-Adjacent230 kV300 MW3.5 yrs58.0
FIREHOLESubstation-Adjacent230 kV300 MW3.5 yrs57.9
BAR XSubstation-Adjacent230 kV300 MW3.5 yrs57.9
WEST VACOSubstation-Adjacent230 kV300 MW3.5 yrs57.8

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN209493, Sweetwater County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.