Skip to content
Gridcensus

UNKNOWN202531

Substation-Adjacent

Lincoln County, Wyoming · WECC

DC Readiness
56.8
Good / 100

UNKNOWN202531 is a substation-adjacent datacenter candidate site in Lincoln County, Wyoming, interconnecting through WECC. It screens at 56.8/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN202531
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW

Speed to power

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPSTRATA Vernal Data Center
IXP distance101.8 mi
Fiber providers4
Fiber coverage77.4%

Site characteristics

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score90/100

Location context

Nearest datacenterFamily History Center
DC distance71.3 mi
County hazard (FEMA NRI)Very Low (10)
DC tax incentiveYes (no_income_tax)
Commercial electricity8.43¢/kWh
Industrial electricity6.50¢/kWh
Cooling degree days300
Heating degree days7,600
Land price / acre$3,963

Incentive detail: No state corporate or personal income tax; low property taxes.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
40
Fiber connectivity12%
39
Energy cost10%
50
Water risk8%
48
Natural hazard8%
90
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
55
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Lincoln County, ranked by DC Readiness.

Sites near UNKNOWN202531
SiteTypeVoltageCapacityQueue waitScore
CRAVEN CREEKSubstation-Adjacent230 kV300 MW6.9 yrs57.6
UNKNOWN202402Substation-Adjacent230 kV300 MW6.9 yrs57.6
UNKNOWN203660Substation-Adjacent230 kV300 MW6.9 yrs57.6
UNKNOWN202400Substation-Adjacent230 kV300 MW6.9 yrs57.6
UNKNOWN201480Substation-Adjacent230 kV300 MW6.9 yrs56.8
TAP207250Substation-Adjacent115 kV100 MW6.9 yrs53.2
TAP207255Substation-Adjacent69 kV50 MW6.9 yrs51.2
TAP207258Substation-Adjacent69 kV50 MW6.9 yrs51.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN202531, Lincoln County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.