Wyoming Theater
IndustrialAlbany County, Wyoming · WECC
Wyoming Theater is an industrial datacenter candidate site in Albany County, Wyoming, interconnecting through WECC. It screens at 51.3/100 DC Readiness and a 6.9 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
Low-cost power and land; DC-friendly posture.
Incentive detail: No state corporate or personal income tax; low property taxes.
Site location
Get alerts
Track Wyoming Theater
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Albany County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| OZ Albany | Greenfield | — | — | 1.7 yrs | 62.6 |
| OZ Albany | Greenfield | — | — | 1.7 yrs | 61.9 |
| OZ Albany | Greenfield | — | — | 1.7 yrs | 61.7 |
| UNKNOWN202676 | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 61.5 |
| UNKNOWN201269 | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 61.2 |
| UNKNOWN204224 | Substation-Adjacent | 245 kV | 300 MW | 6.9 yrs | 60.8 |
| UNKNOWN204108 | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 60.8 |
| EC Coal Albany County | Greenfield | — | — | 1.7 yrs | 60.8 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen