TAP161969 is a substation-adjacent datacenter candidate site in Vernon, Wisconsin, interconnecting through MISO. It screens at 54.9/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP161969
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilitySCENIC RIVERS ENERGY COOPcooperativefavorable to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth133
Avg queue wait2.8 yrs

Connectivity

Nearest IXPSupraNet Communications Madison
IXP distance75.4 mi
Fiber providers6
Fiber coverage95.2%

Site characteristics

Land contactVernon County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterDatacenter 1211362828
DC distance60.3 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.41¢/kWh
Industrial electricity9.00¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$5,236

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP161969

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
45
Fiber connectivity12%
64
Energy cost10%
50
Water risk7%
94
Natural hazard6%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Vernon, ranked by DC Readiness.

Sites near TAP161969
SiteTypeVoltageCapacityQueue waitScore
EC Coal Vernon CountyGreenfield——1.4 yrs60.3
EC Coal Vernon CountyGreenfield——1.4 yrs60.1
EC Coal Vernon CountyGreenfield——1.4 yrs59.8
EC Near GenoaGreenfield——1.4 yrs59.8
EC Near GenoaGreenfield——1.4 yrs58.2
EC Near GenoaGreenfield——1.4 yrs58.0
OZ VernonGreenfield——1.4 yrs57.9
EC Near GenoaGreenfield——1.4 yrs57.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen