Mine Site

Former Mine

Shawano County, Wisconsin · MISO

DC Readiness
41.0
Fair / 100

Mine Site is a former mine datacenter candidate site in Shawano County, Wisconsin, interconnecting through MISO. It screens at 41.0/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionMISO
Queue depth41

Connectivity

Nearest IXP901 Commerce Dr
IXP distance51.1 mi

Site characteristics

Site typeFormer Mine
Former useMining: SandAndGravel; Status: Abandoned
Cleanup statusAbandoned

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenter901 Commerce Dr
DC distance51.1 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.81¢/kWh
Industrial electricity8.64¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$5,983

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
40
Fiber connectivity12%
41
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Shawano County, ranked by DC Readiness.

Sites near Mine Site
SiteTypeVoltageCapacityQueue waitScore
WHITCOMBSubstation-Adjacent345 kV600 MW1.4 yrs71.2
HIGHWAY 22Substation-Adjacent345 kV600 MW1.4 yrs69.7
CAROLINESubstation-Adjacent345 kV600 MW1.4 yrs69.2
CLOVERLEAFSubstation-Adjacent138 kV100 MW1.4 yrs66.6
WHITE CLAYSubstation-Adjacent138 kV100 MW1.4 yrs66.4
WEST SHAWANOSubstation-Adjacent138 kV100 MW1.4 yrs66.2
Greenfield (HIGHWAY 22 - MORGAN)Greenfield345 kV600 MW1.4 yrs66.0
BADGERSubstation-Adjacent138 kV100 MW1.4 yrs65.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mine Site, Shawano County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.