Skip to content
Gridcensus

Monroe County, Wisconsin · MISO

DC Readiness
52.2
Fair / 100

TAP158690 is a substation-adjacent datacenter candidate site in Monroe County, Wisconsin, interconnecting through MISO. It screens at 52.2/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP158690
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW

Speed to power

ISO / RTO regionMISO
Queue depth27
Avg queue wait2.8 yrs

Connectivity

Nearest IXP901 Commerce Dr
IXP distance46.5 mi
Fiber providers10
Fiber coverage48.0%

Site characteristics

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenter901 Commerce Dr
DC distance46.5 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.63¢/kWh
Industrial electricity8.75¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$5,240

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power15%
40
Fiber connectivity12%
28
Energy cost10%
50
Water risk8%
94
Natural hazard8%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Monroe County, ranked by DC Readiness.

Sites near TAP158690
SiteTypeVoltageCapacityQueue waitScore
MONROESubstation-Adjacent161 kV100 MW2.8 yrs54.9
COUNCIL CREEKSubstation-Adjacent138 kV100 MW2.8 yrs54.5
Mine SiteFormer Mine2.8 yrs52.5
Sparta South Point Businesses ParkShovel-Ready2.8 yrs52.3
Mine SiteFormer Mine2.8 yrs52.3
UNKNOWN158695Substation-Adjacent69 kV50 MW2.8 yrs52.2
TAP158709Substation-Adjacent69 kV50 MW2.8 yrs52.2
SPARTASubstation-Adjacent69 kV50 MW2.8 yrs52.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP158690, Monroe County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.