Mirro Plant #9

Industrial

Manitowoc County, Wisconsin · MISO

DC Readiness
39.4
Limited / 100

Mirro Plant #9 is a industrial datacenter candidate site in Manitowoc County, Wisconsin, interconnecting through MISO. It screens at 39.4/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionMISO
Queue depth41

Connectivity

Nearest IXPEthoplex Edge DC - Green Bay
IXP distance30.1 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterEthoplex Edge DC - Green Bay
DC distance30.1 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.33¢/kWh
Industrial electricity7.81¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$7,751

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
40
Fiber connectivity12%
21
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Manitowoc County, ranked by DC Readiness.

Sites near Mirro Plant #9
SiteTypeVoltageCapacityQueue waitScore
POINT BEACH STATIONSubstation-Adjacent345 kV600 MW1.4 yrs69.6
KEWAUNEESubstation-Adjacent345 kV600 MW1.4 yrs67.4
Greenfield (POINT BEACH STATION - SHEBOYGA)Greenfield345 kV600 MW1.4 yrs66.6
Greenfield (POINT BEACH STATION - BRANCH R)Greenfield345 kV600 MW1.4 yrs66.4
Greenfield (POINT BEACH STATION - FOX RIVE)Greenfield345 kV600 MW1.4 yrs65.9
Greenfield (FOREST JUNCTION - BRANCH RIVER)Greenfield345 kV600 MW1.4 yrs65.8
BRANCH RIVERSubstation-Adjacent345 kV600 MW1.4 yrs65.1
Greenfield (POINT BEACH STATION - SHEBOYGA)Greenfield345 kV600 MW1.4 yrs64.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Mirro Plant #9, Manitowoc County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.