Hurd (Prospect Street Facility)

Industrial

Lincoln County, Wisconsin · MISO

DC Readiness
42.4
Fair / 100

Hurd (Prospect Street Facility) is a industrial datacenter candidate site in Lincoln County, Wisconsin, interconnecting through MISO. It screens at 42.4/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionMISO
Queue depth41

Connectivity

Nearest IXP901 Commerce Dr
IXP distance43.9 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenter901 Commerce Dr
DC distance43.9 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.34¢/kWh
Industrial electricity7.63¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$3,790

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
40
Fiber connectivity12%
53
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Lincoln County, ranked by DC Readiness.

Sites near Hurd (Prospect Street Facility)
SiteTypeVoltageCapacityQueue waitScore
PINE (WPS)Substation-Adjacent115 kV100 MW1.4 yrs67.5
BUNKER HILLSubstation-Adjacent115 kV100 MW1.4 yrs65.2
GRANDFATHER FALLSSubstation-Adjacent115 kV100 MW1.4 yrs65.0
Greenfield (PINE (WPS) - TAP139528)Greenfield115 kV100 MW1.4 yrs62.2
PACKAGING OF AMERICA TOMAHAWK MILLSubstation-Adjacent115 kV100 MW1.4 yrs60.8
Greenfield (PINE (WPS) - TAP139528)Greenfield115 kV100 MW1.4 yrs60.2
TOMAHAWK-ATC 115KVSubstation-Adjacent115 kV100 MW1.4 yrs58.9
OZ LincolnGreenfield1.4 yrs57.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Hurd (Prospect Street Facility), Lincoln County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.