Fennimore Industrial Park
Shovel-ReadyGrant, Wisconsin · MISO
At a glance
Fennimore Industrial Park is a shovel-ready datacenter candidate site in Grant, Wisconsin, scoring 49.4/100 DC Readiness — 55th of 56 scored sites in the county. It sits in the MISO grid region and the SCENIC RIVERS ENERGY COOP service territory, where interconnection has averaged 4.3 years from request to operation. GridCensus catalogs 5 MW of candidate capacity here.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
Site location
Get alerts
Track Fennimore Industrial Park
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Fennimore Industrial Park compare with other sites in Grant?
Fennimore Industrial Park ranks 55th of 56 scored candidate sites in Grant. Its 49.4/100 is about 11% below the county average of 55.5. It is about 11% below the Wisconsin average of 55.4 and roughly in line with the national average of 53.2.
Against the Wisconsin average, its strongest sub-score is natural hazard (78 vs 77) and its weakest is power availability (23 vs 38). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Fennimore Industrial Park to power, fiber and other datacenters?
The nearest located transmission bottleneck is ALEWEC02_ROCKDAL1_66320_66 (MISO), 80 miles away. For connectivity, the nearest internet exchange facility is USSHC at 53.5 miles. 9 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is USSHC, 53.5 miles away.
What are the flood, water and hazard risks at Fennimore Industrial Park?
At the county level, FEMA's National Risk Index rates Grant "Relatively Low".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Grant, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| EC Near Nelson Dewey Generating Station | Greenfield | — | — | 4.3 yrs | 60.4 |
| EC Coal Grant County | Greenfield | — | — | 4.3 yrs | 59.6 |
| EC Near Nelson Dewey Generating Station | Greenfield | — | — | 4.3 yrs | 59.5 |
| EC Near Nelson Dewey Generating Station | Greenfield | — | — | 4.3 yrs | 59.4 |
| EC Coal Grant County | Greenfield | — | — | 4.3 yrs | 59.4 |
| EC Near Nelson Dewey Generating Station | Greenfield | — | — | 4.3 yrs | 59.2 |
| EC Near Nelson Dewey Generating Station | Greenfield | — | — | 4.3 yrs | 58.6 |
| EC Near Nelson Dewey Generating Station | Greenfield | — | — | 4.3 yrs | 58.5 |
Fennimore Industrial Park: common questions
What is the DC Readiness score of Fennimore Industrial Park?
Fennimore Industrial Park scores 49.4/100 on the GridCensus DC Readiness scale, rated fair. It ranks 55th of 56 scored sites in Grant. The Grant average is 55.5 and the Wisconsin average is 55.4.
Which electric utility serves Fennimore Industrial Park?
SCENIC RIVERS ENERGY COOP (cooperative) holds the retail service territory that contains the site.
What grid region is Fennimore Industrial Park in?
Fennimore Industrial Park is in the MISO region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.
How far is Fennimore Industrial Park from an internet exchange?
The nearest internet exchange facility is USSHC, about 53.5 miles away; 9 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Fennimore Industrial Park, Grant, WI”, https://gridcensus.com/datacenter-sites/wisconsin/grant/fennimore-industrial-park-b21c60d4 (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Fennimore Industrial Park, Grant is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.