Greenfield (SEVEN MILE - TREMVAL)

Greenfield

Eau Claire, Wisconsin · MISO

DC Readiness
64.4
Good / 100

Greenfield (SEVEN MILE - TREMVAL) is a greenfield datacenter candidate site in Eau Claire, Wisconsin, interconnecting through MISO. It screens at 64.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 1.4 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationSEVEN MILE
Substation voltage161 kV
Available capacity100 MW
LMP zoneMISO_MINN
Wholesale LMP$34.82/MWh
Utility commercial rate0.12¢/kWh

Speed to power

ISO / RTO regionMISO
Queue depth16
Avg queue wait1.4 yrs
Recent queue wait1.4 yrs
Completion rate18%
Withdrawal rate82%

Connectivity

Nearest IXP901 Commerce Dr
IXP distance58.6 mi
Fiber providers10
Fiber coverage53.7%
Nearest cloud providerAzure
Nearest cloud regioncentralus
Cloud region distance214.6 mi

Site characteristics

Site typeGreenfield
Parcel ownerNORTHERN STATES POWER CO
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity

Risk & environment

Flood zoneZone X
Water stress (WRI)0.30
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score78/100
Construction cost index90.8 (avg 100)

Location context

Nearest datacenterWest Wisconsin Telcom DC
DC distance29.8 mi
Nearest rail5.3 mi
Nearest gas pipeline9.2 mi
Nearest fiber route144.3 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.78¢/kWh
Industrial electricity8.61¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$6,093

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
32
Speed to power15%
57
Fiber connectivity12%
62
Energy cost10%
86
Water risk8%
94
Natural hazard8%
78
Buildability7%
92
Labor market4%
50
DC cluster4%
60
Land / acreage3%
45
Construction cost3%
74
Gas pipeline2%
70
Tax incentive2%
100
Climate / cooling2%
95

Nearby comparable sites

Other scored datacenter candidate sites in Eau Claire, ranked by DC Readiness.

Sites near Greenfield (SEVEN MILE - TREMVAL)
SiteTypeVoltageCapacityQueue waitScore
SEVEN MILESubstation-Adjacent161 kV100 MW1.4 yrs71.0
UNKNOWN161952Substation-Adjacent161 kV100 MW1.4 yrs70.8
TAP163522Substation-Adjacent161 kV100 MW1.4 yrs70.2
UNKNOWN143576Substation-Adjacent161 kV100 MW1.4 yrs70.2
UNKNOWN163509Substation-Adjacent161 kV100 MW1.4 yrs69.3
UNKNOWN131390Substation-Adjacent161 kV100 MW1.4 yrs67.1
Greenfield (UNKNOWN129869 - ARPIN)Greenfield345 kV600 MW1.4 yrs65.6
Sky Park SolarBrownfield1 MW64.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (SEVEN MILE - TREMVAL), Eau Claire. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.