Datacenter Sites in Eau Claire, Wisconsin

Eau Claire has 30 scored datacenter candidate sites averaging 59.2/100 DC Readiness, with a catalogued aggregate of 2,911 MW. FEMA rates local natural-hazard risk as "Relatively Low". The county has a datacenter tax incentive on record.

30
Candidate sites
59.2/100
Avg DC Readiness
2,911 MW
Catalogued capacity
theoretical aggregate
Relatively Low
Hazard rating
◆ Loading map…
≥ 7560–7540–60≤ 40
Top 25 in Eau Claire

Site-selection context for Eau Claire

Yessales_tax_exemption
Datacenter tax incentive
11.78¢/kWh
Commercial electricity
8.61¢/kWh
Industrial electricity
10
Fiber providers
Low
Water stress
$6,093
Land price / acre
600
Cooling degree days
7,200
Heating degree days
44°F
Mean annual temp

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

By site type

Top datacenter sites in Eau Claire

Top datacenter sites in Eau Claire
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN129869Substation-Adjacent345 kV600 MW2.8 yrs61.8
EC Near Seven Mile Creek LFGGreenfield1.4 yrs60.7
OZ Eau ClaireGreenfield1.4 yrs60.4
EC Near Seven Mile Creek LFGGreenfield1.4 yrs59.6
EC Near Seven Mile Creek LFGGreenfield1.4 yrs59.1
UNKNOWN131980Substation-Adjacent161 kV100 MW2.8 yrs57.5
EC Near Seven Mile Creek LFGGreenfield1.4 yrs57.5
UNKNOWN161952Substation-Adjacent161 kV100 MW2.8 yrs56.3
SEVEN MILESubstation-Adjacent161 kV100 MW2.8 yrs56.3
TAP163522Substation-Adjacent161 kV100 MW2.8 yrs56.3
UNKNOWN143576Substation-Adjacent161 kV100 MW2.8 yrs56.3
UNKNOWN143571Substation-Adjacent161 kV100 MW2.8 yrs56.3
EC Near Seven Mile Creek LFGGreenfield1.4 yrs56.1
EC Near Seven Mile Creek LFGGreenfield1.4 yrs55.4
UNKNOWN143570Substation-Adjacent69 kV50 MW2.8 yrs54.2
TAP163334Substation-Adjacent69 kV50 MW2.8 yrs54.2
UNKNOWN163309Substation-Adjacent69 kV50 MW2.8 yrs53.6
UNKNOWN144285Substation-Adjacent69 kV50 MW2.8 yrs53.6
UNKNOWN143563Substation-Adjacent69 kV50 MW2.8 yrs53.6
TAP163526Substation-Adjacent69 kV50 MW2.8 yrs53.6
TAP163514Substation-Adjacent69 kV50 MW2.8 yrs53.6
TAP163523Substation-Adjacent69 kV50 MW2.8 yrs53.6
UNKNOWN143577Substation-Adjacent69 kV50 MW2.8 yrs53.6
TAP163528Substation-Adjacent69 kV50 MW2.8 yrs53.6
UNKNOWN163296Substation-Adjacent69 kV50 MW2.8 yrs53.6

Eau Claire datacenter FAQ

How many datacenter sites are in Eau Claire?
30 scored datacenter candidate sites, averaging 59.2/100 DC Readiness.
Does Eau Claire offer datacenter tax incentives?
Enterprise Zone tax credits; TIF available for DC construction in eligible areas.
What is the natural-hazard risk in Eau Claire?
FEMA's National Risk Index rates Eau Claire as "Relatively Low" (score 22).
What are industrial electricity rates in Eau Claire?
Average industrial electricity is 8.61¢/kWh and commercial is 11.78¢/kWh in Eau Claire.

Dataset updated . Screening estimates derived from public data sources.