Skip to content
Gridcensus

Dickinson County, Wisconsin · MISO

DC Readiness
52.6
Fair / 100

BLUFF VIEW is a substation-adjacent datacenter candidate site in Dickinson County, Wisconsin, interconnecting through MISO. It screens at 52.6/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationBLUFF VIEW
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityWISCONSIN ELECTRIC POWER COinvestor ownedfavorable to large load · terms ≥ 100 MWVery Large Customer (VLC) tariff · 10 yr

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth133
Avg queue wait2.8 yrs

Connectivity

Nearest IXPEthoplex Edge DC - Green Bay
IXP distance93.7 mi
Fiber providers6
Fiber coverage30.5%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score75/100

Location context

Nearest datacenterEthoplex Edge DC - Green Bay
DC distance93.7 mi
County hazard (FEMA NRI)Relatively Moderate (25)
DC tax incentiveYes (property_tax_exemption)
Commercial electricity15.96¢/kWh
Industrial electricity12.57¢/kWh
Cooling degree days700
Heating degree days6,600
Land price / acre$3,012

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Personal property tax exemption for eligible DC equipment; MEGA tax credits.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track BLUFF VIEW

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
27
Fiber connectivity12%
59
Energy cost10%
50
Water risk7%
94
Natural hazard6%
75
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
90

Nearby comparable sites

Other scored datacenter candidate sites in Dickinson County, ranked by DC Readiness.

Sites near BLUFF VIEW
SiteTypeVoltageCapacityQueue waitScore
PLAINSSubstation-Adjacent345 kV600 MW3.8 yrs63.0
ARNOLDSubstation-Adjacent345 kV600 MW3.8 yrs62.9
UNKNOWN129052Substation-Adjacent138 kV100 MW3.8 yrs57.1
FORSYTHSubstation-Adjacent138 kV100 MW3.8 yrs56.8
NORDICSubstation-Adjacent138 kV100 MW3.8 yrs56.7
TWIN FALLS SW STASubstation-Adjacent69 kV50 MW3.8 yrs55.3
NIAGRA PAPER OF WISCONSINSubstation-Adjacent138 kV100 MW2.8 yrs55.0
TAP171296Substation-Adjacent69 kV50 MW3.8 yrs54.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for BLUFF VIEW, Dickinson County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.