Skip to content
Gridcensus

UNKNOWN139641

Substation-Adjacent

Buffalo County, Wisconsin · MISO

DC Readiness
55.8
Good / 100

UNKNOWN139641 is a substation-adjacent datacenter candidate site in Buffalo County, Wisconsin, interconnecting through MISO. It screens at 55.8/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN139641
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityRIVERLAND ENERGY COOPERATIVEcooperativefavorable to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth133
Avg queue wait2.8 yrs

Connectivity

Nearest IXPSFN MN-Rochester
IXP distance34.3 mi
Fiber providers5
Fiber coverage75.2%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterNP Rochester
DC distance34.3 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.29¢/kWh
Industrial electricity9.02¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$5,134

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN139641

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
45
Fiber connectivity12%
71
Energy cost10%
50
Water risk7%
94
Natural hazard6%
78
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Buffalo County, ranked by DC Readiness.

Sites near UNKNOWN139641
SiteTypeVoltageCapacityQueue waitScore
EC Near AlmaGreenfield——1.4 yrs62.5
UNKNOWN131555Substation-Adjacent161 kV100 MW2.8 yrs60.4
EC Coal Buffalo CountyGreenfield——1.4 yrs60.0
EC Near AlmaGreenfield——1.4 yrs59.8
EC Near AlmaGreenfield——1.4 yrs59.6
EC Near AlmaGreenfield——1.4 yrs59.0
EC Near AlmaGreenfield——1.4 yrs58.2
EC Near AlmaGreenfield——1.4 yrs58.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN139641, Buffalo County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.