Cumberland Industrial Park is a shovel-ready datacenter candidate site in Barron County, Wisconsin, interconnecting through MISO. It screens at 37.4/100 DC Readiness with a catalogued 30 MW of candidate capacity.

Power & interconnection

Available capacity30 MW

Speed to power

ISO / RTO regionMISO
Queue depth41

Connectivity

Nearest IXPVerus Corportation
IXP distance67.3 mi

Site characteristics

Site typeShovel-Ready
Acreage100 ac
Former useZoning: Industrial; Co-op: Barron Electric

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterWest Wisconsin Telcom DC
DC distance45.8 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity11.51¢/kWh
Industrial electricity11.29¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$4,336

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
26
Speed to power15%
40
Fiber connectivity12%
14
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
58
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Barron County, ranked by DC Readiness.

Sites near Cumberland Industrial Park
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN107655Substation-Adjacent161 kV100 MW1.4 yrs63.7
OZ BarronGreenfield1.4 yrs62.5
BARRONSubstation-Adjacent161 kV100 MW1.4 yrs62.4
Greenfield (UNKNOWN107655 - BARRON)Greenfield161 kV100 MW1.4 yrs62.3
Greenfield (UNKNOWN107655 - BARRON)Greenfield161 kV100 MW1.4 yrs62.2
EC Near BarronGreenfield1.4 yrs61.5
EC Near BarronGreenfield1.4 yrs60.1
EC Near BarronGreenfield1.4 yrs59.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Cumberland Industrial Park, Barron County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.