Skip to content
Gridcensus

Roffers Construction - Former

Industrial

Ashland County, Wisconsin · MISO

DC Readiness
51.0
Fair / 100

Roffers Construction - Former is an industrial datacenter candidate site in Ashland County, Wisconsin, interconnecting through MISO. It screens at 51.0/100 DC Readiness and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth133
Avg queue wait2.8 yrs

Connectivity

Nearest IXP421 N 6th Ave East
IXP distance59.4 mi
Fiber providers5
Fiber coverage50.9%

Site characteristics

Site typeIndustrial
Land contactAshland County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenter421 N 6th Ave East
DC distance59.4 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.12¢/kWh
Industrial electricity8.58¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$3,235

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Roffers Construction - Former

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
45
Fiber connectivity12%
64
Energy cost10%
50
Water risk7%
94
Natural hazard6%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Ashland County, ranked by DC Readiness.

Sites near Roffers Construction - Former
SiteTypeVoltageCapacityQueue waitScore
OZ AshlandGreenfield——1.4 yrs58.3
GINGLESSubstation-Adjacent161 kV100 MW2.8 yrs57.6
TAP138650Substation-Adjacent115 kV100 MW2.8 yrs56.8
TAP173402Substation-Adjacent115 kV100 MW2.8 yrs56.7
Bay FrontBrownfield—20 MW1.4 yrs56.0
Timeless TimberIndustrial——2.8 yrs51.0
Baron Radiator ShopIndustrial——2.8 yrs51.0
23rd Avenue Undeveloped ROWIndustrial——2.8 yrs51.0

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Roffers Construction - Former, Ashland County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.