Skip to content
Gridcensus

Easton Store

Industrial

Adams County, Wisconsin · MISO

DC Readiness
52.9
Fair / 100

Easton Store is an industrial datacenter candidate site in Adams County, Wisconsin, interconnecting through MISO. It screens at 52.9/100 DC Readiness and a 2.8 yrs average interconnection-queue wait.

Power & interconnection

UtilityADAMS-COLUMBIA ELECTRIC COOPcooperativefavorable to large load · state default

Speed to power

Interconnection outlookFavorable
≈ 2.8 yrs typical interconnection wait

Shorter queues and healthier completion here — a faster path to energization than the national norm.

ISO / RTO regionMISO
Queue depth133
Avg queue wait2.8 yrs

Connectivity

Nearest IXPSupraNet Communications Madison
IXP distance54.5 mi
Fiber providers5
Fiber coverage89.1%

Site characteristics

Site typeIndustrial

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score78/100

Location context

Nearest datacenterMarquette-Adams Telephone Coop
DC distance12.3 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity13.27¢/kWh
Industrial electricity9.16¢/kWh
Cooling degree days600
Heating degree days7,200
Land price / acre$5,155

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; TIF available for DC construction in eligible areas.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track Easton Store

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
27
Fiber connectivity12%
71
Energy cost10%
50
Water risk7%
94
Natural hazard6%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
45
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
95

Nearby comparable sites

Other scored datacenter candidate sites in Adams County, ranked by DC Readiness.

Sites near Easton Store
SiteTypeVoltageCapacityQueue waitScore
BADGER WESTSubstation-Adjacent138 kV100 MW2.8 yrs58.0
ACEC BROOKSSubstation-Adjacent69 kV50 MW2.8 yrs57.2
MCKENNASubstation-Adjacent69 kV50 MW2.8 yrs57.2
LINCOLN PUMP STASubstation-Adjacent69 kV50 MW2.8 yrs57.0
TAP158760Substation-Adjacent69 kV50 MW2.8 yrs57.0
TAP158762Substation-Adjacent69 kV50 MW2.8 yrs56.7
TAP158934Substation-Adjacent69 kV50 MW2.8 yrs56.7
HOUGHTON ROCKSubstation-Adjacent69 kV50 MW2.8 yrs56.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Easton Store, Adams County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.