Columbia Gas Building

Industrial

Ohio County, West Virginia · PJM

DC Readiness
51.7
Fair / 100

Columbia Gas Building is an industrial datacenter candidate site in Ohio County, West Virginia, interconnecting through PJM. It screens at 51.7/100 DC Readiness and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionPJM
Queue depth130
Avg queue wait3.8 yrs

Connectivity

Nearest IXPDataBank Pittsburgh (PIT2)
IXP distance38.7 mi
Fiber providers5
Fiber coverage36.7%

Site characteristics

Site typeIndustrial

Risk & environment

Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score78/100

Location context

Nearest datacenterDataBank Pittsburgh PIT2
DC distance38.7 mi
County hazard (FEMA NRI)Relatively Low (22)
DC tax incentiveNo
Commercial electricity11.76¢/kWh
Industrial electricity7.39¢/kWh
Cooling degree days800
Heating degree days5,000
Land price / acre$4,459

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
52
Fiber connectivity12%
60
Energy cost10%
50
Water risk8%
92
Natural hazard8%
78
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
85

Nearby comparable sites

Other scored datacenter candidate sites in Ohio County, ranked by DC Readiness.

Sites near Columbia Gas Building
SiteTypeVoltageCapacityQueue waitScore
EC Coal Ohio CountyGreenfield3.0 yrs60.9
OZ OhioGreenfield3.0 yrs60.7
EC Coal Ohio CountyGreenfield3.0 yrs59.7
EC Coal Ohio CountyGreenfield3.0 yrs58.0
EC FFE Ohio CountyGreenfield3.0 yrs57.9
EC Coal Ohio CountyGreenfield3.0 yrs57.6
EC Coal Ohio CountyGreenfield3.0 yrs57.5
EC Coal Ohio CountyGreenfield3.0 yrs57.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.