ARMSTRONG
Substation-AdjacentWhitman, Washington · WECC
ARMSTRONG is a substation-adjacent datacenter candidate site in Whitman, Washington, interconnecting through WECC. It screens at 57.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.
Power & interconnection
Speed to power
Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Incentive detail: Sales tax exemption on DC equipment and construction for eligible facilities; no state income tax.
Site location
Get alerts
Track ARMSTRONG
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Whitman, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| ROSALIA | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 62.3 |
| SHAWNEE | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 61.8 |
| UNKNOWN206429 | Substation-Adjacent | 230 kV | 300 MW | 6.9 yrs | 61.5 |
| EC Near Washington State University | Greenfield | — | — | 1.7 yrs | 61.5 |
| EC Near Washington State University | Greenfield | — | — | 1.7 yrs | 61.2 |
| EC Near Washington State University | Greenfield | — | — | 1.7 yrs | 60.9 |
| EC Near Washington State University | Greenfield | — | — | 1.7 yrs | 60.8 |
| EC Near Washington State University | Greenfield | — | — | 1.7 yrs | 60.6 |
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen