Skip to content
Gridcensus

UNKNOWN201446

Substation-Adjacent

Lewis County, Washington · WECC

DC Readiness
57.1
Good / 100

UNKNOWN201446 is a substation-adjacent datacenter candidate site in Lewis County, Washington, interconnecting through WECC. It screens at 57.1/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN201446
Substation distance0.0 mi
Substation voltage115 kV
Available capacity100 MW
UtilityPUGET SOUND ENERGY INCinvestor ownedmoderate to large load · terms ≥ 50 MW

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPScaleMatrix Seattle Data Center US-West 02
IXP distance24.5 mi
Fiber providers8
Fiber coverage18.7%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low-Medium
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score72/100

Location context

Nearest datacenterWave Broadband Tahoma Terra Facility
DC distance17.7 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.65¢/kWh
Industrial electricity6.37¢/kWh
Cooling degree days300
Heating degree days5,000
Land price / acre$9,421

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Sales tax exemption on DC equipment and construction for eligible facilities; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN201446

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
56
Speed to power20%
56
Fiber connectivity12%
60
Energy cost10%
50
Water risk7%
64
Natural hazard6%
72
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Lewis County, ranked by DC Readiness.

Sites near UNKNOWN201446
SiteTypeVoltageCapacityQueue waitScore
EC Near Transalta Centralia GenerationGreenfield——1.7 yrs62.3
EC Near Transalta Centralia GenerationGreenfield——1.7 yrs62.0
EC Coal Lewis CountyGreenfield——1.7 yrs60.9
MOSSYROCK PPSubstation-Adjacent240 kV300 MW6.9 yrs60.6
MAYFIELDSubstation-Adjacent240 kV300 MW6.9 yrs60.3
SILVER CREEKSubstation-Adjacent230 kV300 MW6.9 yrs60.0
EC Coal Lewis CountyGreenfield——1.7 yrs59.7
EC Near Transalta Centralia GenerationGreenfield——1.7 yrs59.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for UNKNOWN201446, Lewis County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.