Island County, Washington · WECC

DC Readiness
58.2
Good / 100

FREEDONIA is a substation-adjacent datacenter candidate site in Island County, Washington, interconnecting through WECC. It screens at 58.2/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationFREEDONIA
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW

Speed to power

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPCSSNW Bellingham
IXP distance20.9 mi
Fiber providers5
Fiber coverage29.3%

Site characteristics

Risk & environment

Water stress (WRI)Low-Medium
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score72/100

Location context

Nearest datacenterCSSNW Bellingham
DC distance20.9 mi
County hazard (FEMA NRI)Relatively Moderate (28)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.09¢/kWh
Industrial electricity6.60¢/kWh
Cooling degree days300
Heating degree days5,000
Land price / acre$16,100

Incentive detail: Sales tax exemption on DC equipment and construction for eligible facilities; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power15%
42
Fiber connectivity12%
39
Energy cost10%
50
Water risk8%
64
Natural hazard8%
72
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
48
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Island County, ranked by DC Readiness.

Sites near FREEDONIA
SiteTypeVoltageCapacityQueue waitScore
TAP207892Substation-Adjacent115 kV100 MW6.9 yrs59.2
MUKILTEOSubstation-Adjacent115 kV100 MW6.9 yrs58.4
LANGLEYSubstation-Adjacent115 kV100 MW6.9 yrs57.1
MAXWELTONSubstation-Adjacent115 kV100 MW6.9 yrs56.9
BROOKS HILLSubstation-Adjacent115 kV100 MW6.9 yrs56.6
FAIRMOUNTSubstation-Adjacent230 kV300 MW6.9 yrs56.4
FREELANDSubstation-Adjacent115 kV100 MW6.9 yrs55.9
TAP207876Substation-Adjacent115 kV100 MW6.9 yrs55.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for FREEDONIA, Island County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.