Surry Green Energy Center

Shovel-Ready

Surry County, Virginia · PJM

DC Readiness
51.3
Fair / 100

At a glance

Surry Green Energy Center is a shovel-ready datacenter candidate site in Surry County, Virginia, scoring 51.3/100 DC Readiness — 4th of 4 scored sites in the county. It sits in the PJM grid region and the VIRGINIA ELECTRIC & POWER CO service territory, where interconnection has averaged 5.1 years from request to operation.

Power & interconnection

UtilityVIRGINIA ELECTRIC & POWER COinvestor ownedmoderate to large load · terms ≥ 25 MWSchedule GS-5 (large general service, ≥25 MW) · 85% min take · 14 yr

Speed to power

Interconnection outlookConstrained
≈ 6.0 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth907
Avg queue wait5.1 yrs
Recent queue wait6.0 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPLumen Norfolk
IXP distance31.8 mi
Fiber providers2
Fiber coverage94.1%

Site characteristics

Site typeShovel-Ready
Acreage481 ac
Buildable load (est.)~192–481 MWland-based

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterLumen Norfolk
DC distance31.8 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.11¢/kWh
Industrial electricity6.10¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$2,949

Regulatory climate

Moderatestate posture · as of 2026-08

Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.

DC tax incentiveYes
Large-load threshold≥ 25 MW

Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 3 nearby

Get alerts

Track Surry Green Energy Center

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does Surry Green Energy Center compare with other sites in Surry County?

Surry Green Energy Center ranks 4th of 4 scored candidate sites in Surry County. Its 51.3/100 is roughly in line with the county average of 54.0. It is roughly in line with the Virginia average of 52.6 and roughly in line with the national average of 53.2.

Against the Virginia average, its strongest sub-score is fiber connectivity (72 vs 71) and its weakest is power availability (30 vs 35). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is Surry Green Energy Center to power, fiber and other datacenters?

The nearest located transmission bottleneck is HARWGATE-LOCKS 205C B 230 KV (PJM), 42 miles away. For connectivity, the nearest internet exchange facility is Lumen Norfolk at 31.8 miles. 2 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Lumen Norfolk, 31.8 miles away.

What are the flood, water and hazard risks at Surry Green Energy Center?

At the county level, FEMA's National Risk Index rates Surry County "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
45
Fiber connectivity12%
72
Energy cost10%
50
Water risk7%
88
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
61
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Surry County, ranked by DC Readiness.

Sites near Surry Green Energy Center
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN114517Substation-Adjacent115 kV100 MW5.1 yrs56.9
Greenfield (TAP147063 - SURRY)Greenfield230 kV300 MW5.1 yrs55.6
Surry West Business CenterShovel-Ready——5.1 yrs52.1

Surry Green Energy Center: common questions

What is the DC Readiness score of Surry Green Energy Center?

Surry Green Energy Center scores 51.3/100 on the GridCensus DC Readiness scale, rated fair. It ranks 4th of 4 scored sites in Surry County. The Surry County average is 54.0 and the Virginia average is 52.6.

Which electric utility serves Surry Green Energy Center?

VIRGINIA ELECTRIC & POWER CO (investor owned) holds the retail service territory that contains the site; its holding company is DOMINION RESOURCES.

What grid region is Surry Green Energy Center in?

Surry Green Energy Center is in the PJM region. Projects interconnecting there have averaged a 5.1-year wait from queue request to operation.

How far is Surry Green Energy Center from an internet exchange?

The nearest internet exchange facility is Lumen Norfolk, about 31.8 miles away; 2 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “Surry Green Energy Center, Surry County, VA”, https://gridcensus.com/datacenter-sites/virginia/surry-county/surry-green-energy-center-a95fb8db (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for Surry Green Energy Center, Surry County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.