Skip to content
Gridcensus

ATLANTIC FABRITECH (METAL TANK (HEAVY GAUGE) MANUFACTURING)

Manufacturing

Rockingham, Virginia · PJM

DC Readiness
50.5
Fair / 100

At a glance

ATLANTIC FABRITECH (METAL TANK (HEAVY GAUGE) MANUFACTURING) is a manufacturing datacenter candidate site in Rockingham, Virginia, scoring 50.5/100 DC Readiness — 47th of 71 scored sites in the county. It sits in the PJM grid region and the VIRGINIA ELECTRIC & POWER CO service territory, where interconnection has averaged 5.1 years from request to operation.

Power & interconnection

UtilityVIRGINIA ELECTRIC & POWER COinvestor ownedmoderate to large load · terms ≥ 25 MWSchedule GS-5 (large general service, ≥25 MW) · 85% min take · 14 yr

Speed to power

Interconnection outlookConstrained
≈ 6.0 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth907
Avg queue wait5.1 yrs
Recent queue wait6.0 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPEquinix CU1/CU2/CU3/CU4 - Culpeper
IXP distance40.7 mi
Fiber providers3
Fiber coverage28.0%

Site characteristics

Site typeManufacturing

Risk & environment

Environmental constraintNone (0/100)
Flood zoneZone X
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterDBT Data - Harrisonburg Center
DC distance9.8 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity7.80¢/kWh
Industrial electricity6.16¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$9,531

Regulatory climate

Moderatestate posture · as of 2026-08

Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.

DC tax incentiveYes
Large-load threshold≥ 25 MW

Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track ATLANTIC FABRITECH (METAL TANK (HEAVY GAUGE) MANUFACTURING)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does ATLANTIC FABRITECH (METAL TANK (HEAVY GAUGE) MANUFACTURING) compare with other sites in Rockingham?

ATLANTIC FABRITECH (METAL TANK (HEAVY GAUGE) MANUFACTURING) ranks 47th of 71 scored candidate sites in Rockingham. Its 50.5/100 is roughly in line with the county average of 51.7. It is roughly in line with the Virginia average of 52.6 and roughly in line with the national average of 53.2.

Against the Virginia average, its strongest sub-score is natural hazard (70 vs 69) and its weakest is fiber connectivity (56 vs 71). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is ATLANTIC FABRITECH (METAL TANK (HEAVY GAUGE) MANUFACTURING) to power, fiber and other datacenters?

The nearest located transmission bottleneck is CHARLTSV-PROFITDP 2054B1 A 230 KV (PJM), 25 miles away. For connectivity, the nearest internet exchange facility is Equinix CU1/CU2/CU3/CU4 - Culpeper at 40.7 miles. 3 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is DBT Data - Harrisonburg Center, 9.8 miles away.

What are the flood, water and hazard risks at ATLANTIC FABRITECH (METAL TANK (HEAVY GAUGE) MANUFACTURING)?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk). At the county level, FEMA's National Risk Index rates Rockingham "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
45
Fiber connectivity12%
56
Energy cost10%
50
Water risk7%
88
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Rockingham, ranked by DC Readiness.

Sites near ATLANTIC FABRITECH (METAL TANK (HEAVY GAUGE) MANUFACTURING)
SiteTypeVoltageCapacityQueue waitScore
EC Near ElktonGreenfield——5.1 yrs60.1
EC Near ElktonGreenfield——5.1 yrs59.6
OZ RockinghamGreenfield——5.1 yrs59.6
EC Near ElktonGreenfield——5.1 yrs59.1
EC Near ElktonGreenfield——5.1 yrs56.9
EC Near ElktonGreenfield——5.1 yrs56.8
TIMBERVILLESubstation-Adjacent115 kV100 MW5.1 yrs56.6
EC Near ElktonGreenfield——5.1 yrs55.9

ATLANTIC FABRITECH (METAL TANK (HEAVY GAUGE) MANUFACTURING): common questions

What is the DC Readiness score of ATLANTIC FABRITECH (METAL TANK (HEAVY GAUGE) MANUFACTURING)?

ATLANTIC FABRITECH (METAL TANK (HEAVY GAUGE) MANUFACTURING) scores 50.5/100 on the GridCensus DC Readiness scale, rated fair. It ranks 47th of 71 scored sites in Rockingham. The Rockingham average is 51.7 and the Virginia average is 52.6.

Which electric utility serves ATLANTIC FABRITECH (METAL TANK (HEAVY GAUGE) MANUFACTURING)?

VIRGINIA ELECTRIC & POWER CO (investor owned) holds the retail service territory that contains the site; its holding company is DOMINION RESOURCES.

What grid region is ATLANTIC FABRITECH (METAL TANK (HEAVY GAUGE) MANUFACTURING) in?

ATLANTIC FABRITECH (METAL TANK (HEAVY GAUGE) MANUFACTURING) is in the PJM region. Projects interconnecting there have averaged a 5.1-year wait from queue request to operation.

Is ATLANTIC FABRITECH (METAL TANK (HEAVY GAUGE) MANUFACTURING) in a flood zone?

The site is in FEMA flood zone X, outside the Special Flood Hazard Area (minimal or moderate flood risk).

How far is ATLANTIC FABRITECH (METAL TANK (HEAVY GAUGE) MANUFACTURING) from an internet exchange?

The nearest internet exchange facility is Equinix CU1/CU2/CU3/CU4 - Culpeper, about 40.7 miles away; 3 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “ATLANTIC FABRITECH (METAL TANK (HEAVY GAUGE) MANUFACTURING), Rockingham, VA”, https://gridcensus.com/datacenter-sites/virginia/rockingham/atlantic-fabritech-metal-tank-heavy-gauge-manufacturing-07d47edb (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for ATLANTIC FABRITECH (METAL TANK (HEAVY GAUGE) MANUFACTURING), Rockingham is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.