Skip to content
Gridcensus

VIRGINIA METAL PROCESSING, INC. (NOT AVAILABLE)

Manufacturing

Roanoke, Virginia · PJM

DC Readiness
50.3
Fair / 100

At a glance

VIRGINIA METAL PROCESSING, INC. (NOT AVAILABLE) is a manufacturing datacenter candidate site in Roanoke, Virginia, scoring 50.3/100 DC Readiness — 43rd of 74 scored sites in the county. It sits in the PJM grid region and the CRAIG-BOTETOURT ELECTRIC COOP service territory, where interconnection has averaged 5.1 years from request to operation.

Power & interconnection

UtilityCRAIG-BOTETOURT ELECTRIC COOPnot available

Speed to power

Interconnection outlookConstrained
≈ 6.0 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionPJM
Queue depth907
Avg queue wait5.1 yrs
Recent queue wait6.0 yrs
Completion rate20%
Withdrawal rate80%

Connectivity

Nearest IXPCyrusOne NC-1
IXP distance114.5 mi
Fiber providers6
Fiber coverage66.7%

Site characteristics

Site typeManufacturing

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score70/100

Location context

Nearest datacenterLumos Networks
DC distance44.9 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.95¢/kWh
Industrial electricity6.67¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$6,876

Regulatory climate

Moderatestate posture · as of 2026-08

Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.

DC tax incentiveYes
Large-load threshold≥ 25 MW

Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track VIRGINIA METAL PROCESSING, INC. (NOT AVAILABLE)

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does VIRGINIA METAL PROCESSING, INC. (NOT AVAILABLE) compare with other sites in Roanoke?

VIRGINIA METAL PROCESSING, INC. (NOT AVAILABLE) ranks 43rd of 74 scored candidate sites in Roanoke. Its 50.3/100 is roughly in line with the county average of 50.7. It is roughly in line with the Virginia average of 52.6 and roughly in line with the national average of 53.2.

Against the Virginia average, its strongest sub-score is natural hazard (70 vs 69) and its weakest is power availability (30 vs 35). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is VIRGINIA METAL PROCESSING, INC. (NOT AVAILABLE) to power, fiber and other datacenters?

The nearest located transmission bottleneck is MTAIRYTP-RENAN 35E2 B 69 KV (PJM), 43 miles away. For connectivity, the nearest internet exchange facility is CyrusOne NC-1 at 114.5 miles. 6 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Lumos Networks, 44.9 miles away.

What are the flood, water and hazard risks at VIRGINIA METAL PROCESSING, INC. (NOT AVAILABLE)?

At the county level, FEMA's National Risk Index rates Roanoke "Relatively Moderate".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
45
Fiber connectivity12%
68
Energy cost10%
50
Water risk7%
88
Natural hazard6%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
60

Nearby comparable sites

Other scored datacenter candidate sites in Roanoke, ranked by DC Readiness.

Sites near VIRGINIA METAL PROCESSING, INC. (NOT AVAILABLE)
SiteTypeVoltageCapacityQueue waitScore
MATT FUNKSubstation-Adjacent345 kV600 MW5.1 yrs62.6
OZ RoanokeGreenfield——5.1 yrs59.6
Greenfield (MATT FUNK - KANAWHA RIVER)Greenfield345 kV600 MW5.1 yrs55.2
Roanoke County Center for Research and TechnologyShovel-Ready——5.1 yrs50.6
Wood Haven Technology ParkShovel-Ready——5.1 yrs50.6
Tanglewood Former American Freight BuldingShovel-Ready——5.1 yrs50.5
M & W FIRE APPARATUS (NOT AVAILABLE)Manufacturing——5.1 yrs50.5
NEW MILLENNIUM BUILDING SYSTEMS, LLC (SPECIAL DIE AND TOOL, DIE SET, JIG, AND FIXTURE MANUFACTURING)Manufacturing——5.1 yrs50.5

VIRGINIA METAL PROCESSING, INC. (NOT AVAILABLE): common questions

What is the DC Readiness score of VIRGINIA METAL PROCESSING, INC. (NOT AVAILABLE)?

VIRGINIA METAL PROCESSING, INC. (NOT AVAILABLE) scores 50.3/100 on the GridCensus DC Readiness scale, rated fair. It ranks 43rd of 74 scored sites in Roanoke. The Roanoke average is 50.7 and the Virginia average is 52.6.

Which electric utility serves VIRGINIA METAL PROCESSING, INC. (NOT AVAILABLE)?

CRAIG-BOTETOURT ELECTRIC COOP (not available) holds the retail service territory that contains the site.

What grid region is VIRGINIA METAL PROCESSING, INC. (NOT AVAILABLE) in?

VIRGINIA METAL PROCESSING, INC. (NOT AVAILABLE) is in the PJM region. Projects interconnecting there have averaged a 5.1-year wait from queue request to operation.

How far is VIRGINIA METAL PROCESSING, INC. (NOT AVAILABLE) from an internet exchange?

The nearest internet exchange facility is CyrusOne NC-1, about 114.5 miles away; 6 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “VIRGINIA METAL PROCESSING, INC. (NOT AVAILABLE), Roanoke, VA”, https://gridcensus.com/datacenter-sites/virginia/roanoke/virginia-metal-processing-inc-not-available-69494121 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for VIRGINIA METAL PROCESSING, INC. (NOT AVAILABLE), Roanoke is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.