Former Mine site at 37.389, -80.615
Former MineGILES, Virginia · PJM
At a glance
Former Mine site at 37.389, -80.615 is a former mine datacenter candidate site in GILES, Virginia, scoring 47.7/100 DC Readiness — 37th of 38 scored sites in the county. It sits in the PJM grid region and the CRAIG-BOTETOURT ELECTRIC COOP service territory, where interconnection has averaged 5.1 years from request to operation.
Power & interconnection
Speed to power
Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.
Connectivity
Site characteristics
Risk & environment
Location context
Regulatory climate
Largest US DC market; incentive preserved but a new $0.011/kWh DC electricity tax starts Jul 2026.
Dominion GS-5 large-load rate (≥25 MW, ~$1.5M/MW collateral, 14-yr term) effective 2027.
Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.
Site location
Get alerts
Track Mine Site
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does Former Mine site at 37.389, -80.615 compare with other sites in GILES?
Former Mine site at 37.389, -80.615 ranks 37th of 38 scored candidate sites in GILES. Its 47.7/100 is roughly in line with the county average of 51.1. It is roughly in line with the Virginia average of 52.6 and about 10% below the national average of 53.2.
Against the Virginia average, its strongest sub-score is natural hazard (70 vs 69) and its weakest is fiber connectivity (53 vs 71). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is Former Mine site at 37.389, -80.615 to power, fiber and other datacenters?
The nearest located transmission bottleneck is MTAIRYTP-RENAN 35E2 B 69 KV (PJM), 76 miles away. For connectivity, the nearest internet exchange facility is Citynet Charleston at 87 miles. 2 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Lumos Networks, 80.8 miles away.
What are the flood, water and hazard risks at Former Mine site at 37.389, -80.615?
At the county level, FEMA's National Risk Index rates GILES "Relatively Moderate".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in GILES, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| TAP154211 | Substation-Adjacent | 138 kV | 100 MW | 5.1 yrs | 57.4 |
| CELANESE | Substation-Adjacent | 138 kV | 100 MW | 5.1 yrs | 54.8 |
| OZ Giles | Greenfield | — | — | 5.1 yrs | 54.7 |
| EC Near Celanese Acetate LLC | Greenfield | — | — | 5.1 yrs | 54.5 |
| EC Near Celanese Acetate LLC | Greenfield | — | — | 5.1 yrs | 54.5 |
| EC Near Glen Lyn | Greenfield | — | — | 5.1 yrs | 54.5 |
| PETERS MOUNTAIN | Substation-Adjacent | 138 kV | 100 MW | 5.1 yrs | 54.3 |
| TAP167385 | Substation-Adjacent | 138 kV | 100 MW | 5.1 yrs | 54.2 |
Former Mine site at 37.389, -80.615: common questions
What is the DC Readiness score of Former Mine site at 37.389, -80.615?
Former Mine site at 37.389, -80.615 scores 47.7/100 on the GridCensus DC Readiness scale, rated fair. It ranks 37th of 38 scored sites in GILES. The GILES average is 51.1 and the Virginia average is 52.6.
Which electric utility serves Former Mine site at 37.389, -80.615?
CRAIG-BOTETOURT ELECTRIC COOP (not available) holds the retail service territory that contains the site.
What grid region is Former Mine site at 37.389, -80.615 in?
Former Mine site at 37.389, -80.615 is in the PJM region. Projects interconnecting there have averaged a 5.1-year wait from queue request to operation.
How far is Former Mine site at 37.389, -80.615 from an internet exchange?
The nearest internet exchange facility is Citynet Charleston, about 87 miles away; 2 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “Former Mine site at 37.389, -80.615, GILES, VA”, https://gridcensus.com/datacenter-sites/virginia/giles/mine-site-28f0a68f (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for Former Mine site at 37.389, -80.615, GILES is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.