Greenfield (TAP139259 - DOUBLE TOLL GATE)

Greenfield

CLARKE, Virginia · PJM

DC Readiness
45.6
Fair / 100

Greenfield (TAP139259 - DOUBLE TOLL GATE) is a greenfield datacenter candidate site in CLARKE, Virginia, interconnecting through PJM. It screens at 45.6/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 3.8 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP139259
Substation voltage138 kV
Available capacity100 MW

Speed to power

ISO / RTO regionPJM
Queue depth878
Avg queue wait3.8 yrs

Connectivity

Nearest IXPDigital Realty IAD (43791 Devin Shafron)
IXP distance31.4 mi
Fiber providers3
Fiber coverage10.3%

Site characteristics

Site typeGreenfield

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score70/100

Location context

Nearest datacenterMiddletown Data Center
DC distance14.7 mi
County hazard (FEMA NRI)Relatively Moderate (30)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.18¢/kWh
Industrial electricity7.31¢/kWh
Cooling degree days1,300
Heating degree days4,000
Land price / acre$9,610

Incentive detail: Sales tax exemption on DC equipment for $150M+ investments (2025: $100M+); MEGA site program.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
38
Fiber connectivity12%
11
Energy cost10%
50
Water risk8%
88
Natural hazard8%
70
Buildability7%
50
Labor market4%
50
DC cluster4%
80
Land / acreage3%
46
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
60

Nearby comparable sites

Other scored datacenter candidate sites in CLARKE, ranked by DC Readiness.

Sites near Greenfield (TAP139259 - DOUBLE TOLL GATE)
SiteTypeVoltageCapacityQueue waitScore
PERRY, INC., STUART M. (CUT STONE AND STONE PRODUCT MANUFACTURING)Manufacturing3.5 yrs52.5
TELEPHONE COMPONENTS, INC. (NOT AVAILABLE)Manufacturing3.5 yrs52.2
BERRYVILLE GRAPHICS, INC (BOOK PRINTING)Manufacturing3.5 yrs52.2
COCHRAN'S LUMBER & MILLWORK (SAWMILLS)Manufacturing3.5 yrs52.1
AMERICAN WOODMARK CORP. (WOOD KITCHEN CABINET AND COUNTERTOP MANUFACTURING)Manufacturing3.5 yrs52.1
L'ESPRIT DE CAMPAGNE, INC. (NOT AVAILABLE)Manufacturing3.5 yrs51.9
VIRGINIA HONEY CO., INC. (ALL OTHER MISCELLANEOUS FOOD MANUFACTURING)Manufacturing3.5 yrs51.7
TAP139259Substation-Adjacent138 kV100 MW3.8 yrs51.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Greenfield (TAP139259 - DOUBLE TOLL GATE), CLARKE. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.