DC Readiness
53.2
Fair / 100

DOVER is a substation-adjacent datacenter candidate site in Windham County, Vermont, interconnecting through ISO-NE. It screens at 53.2/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationDOVER
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityGREEN MOUNTAIN POWER CORPinvestor ownedmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookModerate
≈ 3.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionISO-NE
Queue depth5
Avg queue wait3.9 yrs

Connectivity

Nearest IXPTurnKey Internet
IXP distance46.7 mi
Fiber providers6
Fiber coverage59.7%

Site characteristics

Land contactWindham County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score85/100

Location context

Nearest datacenterTurnkey Internet
DC distance46.7 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity19.25¢/kWh
Industrial electricity10.84¢/kWh
Cooling degree days400
Heating degree days7,400
Land price / acre$5,142

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track DOVER

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
36
Fiber connectivity12%
67
Energy cost10%
50
Water risk7%
94
Natural hazard6%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Windham County, ranked by DC Readiness.

Sites near DOVER
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN132814Substation-Adjacent345 kV600 MW3.9 yrs61.4
OZ WindhamGreenfield——3.5 yrs55.8
UNKNOWN133338Substation-Adjacent115 kV100 MW3.9 yrs55.2
HARRIMANSubstation-Adjacent115 kV100 MW3.9 yrs55.2
UNKNOWN135561Substation-Adjacent115 kV100 MW3.9 yrs55.2
TAP170886Substation-Adjacent69 kV50 MW3.9 yrs54.2
PUTNEY GMPSubstation-Adjacent69 kV50 MW3.9 yrs53.2
TAP135802Substation-Adjacent69 kV50 MW3.9 yrs53.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for DOVER, Windham County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.