Skip to content
Gridcensus

Twin State Fertilizer

Industrial

Orange County, Vermont · ISO-NE

DC Readiness
52.2
Fair / 100

Twin State Fertilizer is an industrial datacenter candidate site in Orange County, Vermont, interconnecting through ISO-NE. It screens at 52.2/100 DC Readiness and a 3.9 yrs average interconnection-queue wait.

Power & interconnection

Speed to power

ISO / RTO regionISO-NE
Queue depth4
Avg queue wait3.9 yrs

Connectivity

Nearest IXPVELCO Rutland
IXP distance49.0 mi
Fiber providers8
Fiber coverage79.3%

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score85/100

Location context

Nearest datacenterVELCO Rutland
DC distance49.0 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity19.25¢/kWh
Industrial electricity10.84¢/kWh
Cooling degree days400
Heating degree days7,400
Land price / acre$4,431

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
40
Fiber connectivity12%
72
Energy cost10%
50
Water risk8%
94
Natural hazard8%
85
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
100

Nearby comparable sites

Other scored datacenter candidate sites in Orange County, ranked by DC Readiness.

Sites near Twin State Fertilizer
SiteTypeVoltageCapacityQueue waitScore
OZ OrangeGreenfield3.5 yrs60.2
GRANITESubstation-Adjacent230 kV300 MW3.9 yrs58.8
CHELSEASubstation-Adjacent115 kV100 MW3.9 yrs54.4
Randolph Playhouse TheaterIndustrial3.9 yrs53.7
Salisbury SquareIndustrial3.9 yrs53.7
BranchwoodIndustrial3.9 yrs53.6
Mine SiteFormer Mine3.9 yrs53.4
Mine SiteFormer Mine3.9 yrs53.2

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Twin State Fertilizer, Orange County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.