Diesel #1 Building is a industrial datacenter candidate site in Franklin County, Vermont, interconnecting through ISO-NE. It screens at 43.0/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionISO-NE
Queue depth3

Connectivity

Nearest IXPWestelcom Networks Plattsburgh
IXP distance34.7 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Low
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterWestelcom Networks Plattsburgh
DC distance34.7 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity18.80¢/kWh
Industrial electricity12.00¢/kWh
Cooling degree days400
Heating degree days7,400
Land price / acre$3,906

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
43
Fiber connectivity12%
54
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
40
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Franklin County, ranked by DC Readiness.

Sites near Diesel #1 Building
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN132781Substation-Adjacent115 kV100 MW3.5 yrs62.8
TAP136820Substation-Adjacent115 kV100 MW3.5 yrs60.2
JAYSubstation-Adjacent115 kV100 MW3.5 yrs59.8
VELCO HIGHGATESubstation-Adjacent115 kV100 MW3.5 yrs59.2
Greenfield (UNKNOWN133763 - TAP136820)Greenfield115 kV100 MW3.5 yrs57.4
Greenfield (JAY - VELCO HIGHGATE)Greenfield115 kV100 MW3.5 yrs56.1
Greenfield (GEORGIA SWITCHING STATION - EA)Greenfield115 kV100 MW3.5 yrs54.8
Greenfield (JAY - VELCO HIGHGATE)Greenfield115 kV100 MW3.5 yrs54.7

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.