24 Maple St

Industrial

Franklin County, Vermont · ISO-NE

DC Readiness
50.2
Fair / 100

24 Maple St is an industrial datacenter candidate site in Franklin County, Vermont, interconnecting through ISO-NE. It screens at 50.2/100 DC Readiness and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

UtilityGREEN MOUNTAIN POWER CORPinvestor ownedmoderate to large load · terms ≥ 25 MW

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionISO-NE
Queue depth3
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate25%
Withdrawal rate75%

Connectivity

Nearest IXPWestelcom Networks Plattsburgh
IXP distance19.6 mi
Fiber providers6
Fiber coverage48.0%

Site characteristics

Site typeIndustrial
Land contactFranklin County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Low
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score85/100

Location context

Nearest datacenterWestelcom Networks Plattsburgh
DC distance19.6 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveNo
Commercial electricity18.80¢/kWh
Industrial electricity12.00¢/kWh
Cooling degree days400
Heating degree days7,400
Land price / acre$3,906

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track 24 Maple St

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power20%
48
Fiber connectivity12%
49
Energy cost10%
50
Water risk7%
94
Natural hazard6%
85
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
49
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
0
Climate / cooling1%
100

Nearby comparable sites

Other scored datacenter candidate sites in Franklin County, ranked by DC Readiness.

Sites near 24 Maple St
SiteTypeVoltageCapacityQueue waitScore
TAP136820Substation-Adjacent115 kV100 MW4.3 yrs58.5
Mine SiteFormer Mine——4.3 yrs53.4
GMP Cooling PondsIndustrial——4.3 yrs53.2
Leader EvaporatorIndustrial——4.3 yrs53.1
Field of DreamsIndustrial——4.3 yrs53.1
Fonda Container/Solo Cup - Lot 2Industrial——4.3 yrs53.1
Radar StationIndustrial——4.3 yrs53.1
Lewis Auto BodyIndustrial——4.3 yrs53.1

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for 24 Maple St, Franklin County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.