200 Bridge Street
IndustrialFranklin County, Vermont · ISO-NE
At a glance
200 Bridge Street is an industrial datacenter candidate site in Franklin County, Vermont, scoring 52.3/100 DC Readiness — 29th of 35 scored sites in the county. It sits in the ISO-NE grid region and the GREEN MOUNTAIN POWER CORP service territory, where interconnection has averaged 4.3 years from request to operation.
Power & interconnection
Speed to power
Middle-of-the-pack interconnection conditions for this grid.
Connectivity
Risk & environment
Location context
Regulatory climate
No notable statewide DC restriction on record; confirm local zoning and utility tariffs.
Site location
Get alerts
Track 200 Bridge Street
Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.
How does 200 Bridge Street compare with other sites in Franklin County?
200 Bridge Street ranks 29th of 35 scored candidate sites in Franklin County. Its 52.3/100 is roughly in line with the county average of 52.7. It is roughly in line with the Vermont average of 54.3 and roughly in line with the national average of 53.2.
Against the Vermont average, its strongest sub-score is natural hazard (85 vs 84) and its weakest is fiber connectivity (66 vs 75). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.
How close is 200 Bridge Street to power, fiber and other datacenters?
For connectivity, the nearest internet exchange facility is Westelcom Networks Plattsburgh at 28.1 miles. 6 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is Westelcom Networks Plattsburgh, 28.1 miles away.
What are the flood, water and hazard risks at 200 Bridge Street?
At the county level, FEMA's National Risk Index rates Franklin County "Relatively Low".
Full DC Readiness breakdown
All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.
Nearby comparable sites
Other scored datacenter candidate sites in Franklin County, ranked by DC Readiness.
| Site | Type | Voltage | Capacity | Queue wait | Score |
|---|---|---|---|---|---|
| TAP136820 | Substation-Adjacent | 115 kV | 100 MW | 4.3 yrs | 58.5 |
| Mine Site | Former Mine | — | — | 4.3 yrs | 53.4 |
| GMP Cooling Ponds | Industrial | — | — | 4.3 yrs | 53.2 |
| Leader Evaporator | Industrial | — | — | 4.3 yrs | 53.1 |
| Field of Dreams | Industrial | — | — | 4.3 yrs | 53.1 |
| Fonda Container/Solo Cup - Lot 2 | Industrial | — | — | 4.3 yrs | 53.1 |
| Radar Station | Industrial | — | — | 4.3 yrs | 53.1 |
| Lewis Auto Body | Industrial | — | — | 4.3 yrs | 53.1 |
200 Bridge Street: common questions
What is the DC Readiness score of 200 Bridge Street?
200 Bridge Street scores 52.3/100 on the GridCensus DC Readiness scale, rated fair. It ranks 29th of 35 scored sites in Franklin County. The Franklin County average is 52.7 and the Vermont average is 54.3.
Which electric utility serves 200 Bridge Street?
GREEN MOUNTAIN POWER CORP (investor owned) holds the retail service territory that contains the site.
What grid region is 200 Bridge Street in?
200 Bridge Street is in the ISO-NE region. Projects interconnecting there have averaged a 4.3-year wait from queue request to operation.
How far is 200 Bridge Street from an internet exchange?
The nearest internet exchange facility is Westelcom Networks Plattsburgh, about 28.1 miles away; 6 fiber providers report service at the location.
Related pages
About this data
Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.
Cite as: GridCensus, “200 Bridge Street, Franklin County, VT”, https://gridcensus.com/datacenter-sites/vermont/franklin-county/200-bridge-street-a6053630 (data as of October 10, 2026).
Dataset updated . Screening estimates derived from public data sources.
Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.
Go deeper than the public screen
Every site and score for 200 Bridge Street, Franklin County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.