Skip to content
Gridcensus

UNKNOWN202520

Substation-Adjacent

Uintah, Utah · SPP

DC Readiness
54.3
Fair / 100

UNKNOWN202520 is a substation-adjacent datacenter candidate site in Uintah, Utah, interconnecting through SPP. It screens at 54.3/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 4.3 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN202520
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityMOON LAKE ELECTRIC ASSN INCcooperativefavorable to large load · state default

Speed to power

Interconnection outlookModerate
≈ 4.9 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth34
Avg queue wait4.3 yrs
Recent queue wait4.9 yrs
Completion rate16%
Withdrawal rate84%

Connectivity

Nearest IXPSTRATA Vernal Data Center
IXP distance15.5 mi
Fiber providers1
Fiber coverage51.3%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score85/100

Location context

Nearest datacenterStrata Networks
DC distance15.5 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity8.89¢/kWh
Industrial electricity9.71¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$901

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN202520

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
57
Fiber connectivity12%
70
Energy cost10%
50
Water risk7%
24
Natural hazard6%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
60
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Uintah, ranked by DC Readiness.

Sites near UNKNOWN202520
SiteTypeVoltageCapacityQueue waitScore
BONANZASubstation-Adjacent345 kV600 MW4.3 yrs62.2
EC Coal Uintah CountyGreenfield——4.3 yrs61.4
EC Near BonanzaGreenfield——4.3 yrs60.7
EC Near BonanzaGreenfield——4.3 yrs59.3
ASHLEYSubstation-Adjacent138 kV100 MW4.3 yrs59.0
EC Near BonanzaGreenfield——4.3 yrs58.9
VERNALSubstation-Adjacent138 kV100 MW4.3 yrs58.7
EC Near BonanzaGreenfield——4.3 yrs58.6

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN202520, Uintah is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.