Skip to content
Gridcensus

Summit County, Utah · WECC

DC Readiness
49.4
Fair / 100

TAP204604 is a substation-adjacent datacenter candidate site in Summit County, Utah, interconnecting through WECC. It screens at 49.4/100 DC Readiness with a catalogued 100 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP204604
Substation distance0.0 mi
Substation voltage138 kV
Available capacity100 MW

Speed to power

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPDataBank Salt Lake City (SLC1)
IXP distance48.4 mi
Fiber providers11
Fiber coverage38.3%

Site characteristics

Risk & environment

Water stress (WRI)High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score85/100

Location context

Nearest datacenterDataBank SLC
DC distance48.8 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.26¢/kWh
Industrial electricity8.30¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$4,336

Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
58
Speed to power15%
44
Fiber connectivity12%
25
Energy cost10%
50
Water risk8%
24
Natural hazard8%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
100
Climate / cooling2%
75

Nearby comparable sites

Other scored datacenter candidate sites in Summit County, ranked by DC Readiness.

Sites near TAP204604
SiteTypeVoltageCapacityQueue waitScore
TAP208893Substation-Adjacent115 kV100 MW6.9 yrs51.3
Mine SiteFormer Mine6.9 yrs50.7
TAP208897Substation-Adjacent115 kV100 MW6.9 yrs50.5
CUP, BONNEVILLE UNITFederal Excess6.9 yrs49.9
Alice Lode MiningIndustrial6.9 yrs49.7
WEBER BASINFederal Excess6.9 yrs49.4
CUP, BONNEVILLE UNITFederal Excess6.9 yrs49.4
WEBER BASINFederal Excess6.9 yrs49.3

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP204604, Summit County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.