Skip to content
Gridcensus

Salt Lake County, Utah · WECC

DC Readiness
57.0
Good / 100

At a glance

DEAD HEAD is a substation-adjacent datacenter candidate site in Salt Lake County, Utah, scoring 57.0/100 DC Readiness — 148th of 329 scored sites in the county. Its nearest substation is DEAD HEAD (0 mi, 69 kV). It sits in the WECC grid region and the LEHI CITY CORPORATION service territory, where interconnection has averaged 3.5 years from request to operation. GridCensus catalogs 50 MW of candidate capacity here.

Power & interconnection

Nearest substationDEAD HEAD
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityLEHI CITY CORPORATIONmunicipal

Speed to power

Interconnection outlookConstrained
≈ 5.5 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait3.5 yrs
Recent queue wait5.5 yrs
Completion rate17%
Withdrawal rate84%

Connectivity

Nearest IXPDataBank Salt Lake City (SLC2)
IXP distance5.1 mi
Fiber providers15
Fiber coverage87.7%

Site characteristics

Land contactSalt Lake County County Assessor

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score85/100

Location context

Nearest datacenterDataBank SLC2
DC distance5.1 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.15¢/kWh
Industrial electricity7.62¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$13,993

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track DEAD HEAD

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

How does DEAD HEAD compare with other sites in Salt Lake County?

DEAD HEAD ranks 148th of 329 scored candidate sites in Salt Lake County. Its 57.0/100 is roughly in line with the county average of 57.1. It is about 10% above the Utah average of 51.7 and roughly in line with the national average of 53.2.

Against the Utah average, its strongest sub-score is fiber connectivity (95 vs 72) and its weakest is water (24 vs 25). Power and speed to power each carry 20% of the composite score, fiber 12%, water 7% and hazard 6%.

How close is DEAD HEAD to power, fiber and other datacenters?

The nearest mapped substation, DEAD HEAD, is about 0 miles away and operates at 69 kV. For connectivity, the nearest internet exchange facility is DataBank Salt Lake City (SLC2) at 5.1 miles. 15 fiber providers report service at the location in FCC broadband data. The closest operating datacenter on record is DataBank SLC2, 5.1 miles away.

What are the flood, water and hazard risks at DEAD HEAD?

At the county level, FEMA's National Risk Index rates Salt Lake County "Relatively Low".

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
51
Fiber connectivity12%
95
Energy cost10%
50
Water risk7%
24
Natural hazard6%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
80
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Salt Lake County, ranked by DC Readiness.

Sites near DEAD HEAD
SiteTypeVoltageCapacityQueue waitScore
TERMINALSubstation-Adjacent345 kV600 MW3.5 yrs66.4
90TH SOUTHSubstation-Adjacent345 kV600 MW3.5 yrs66.3
MIDVALLEYSubstation-Adjacent345 kV600 MW3.5 yrs66.3
CAMP WILLIAMSSubstation-Adjacent345 kV600 MW3.5 yrs66.3
OQUIRRHSubstation-Adjacent345 kV600 MW3.5 yrs66.2
EC Near eBay - South JordanGreenfield——3.5 yrs66.0
OZ Salt LakeGreenfield——3.5 yrs65.3
Sharon Steel Corp. (Midvale Tailings)Brownfield46 kV2 MW3.5 yrs65.2

DEAD HEAD: common questions

What is the DC Readiness score of DEAD HEAD?

DEAD HEAD scores 57.0/100 on the GridCensus DC Readiness scale, rated good. It ranks 148th of 329 scored sites in Salt Lake County. The Salt Lake County average is 57.1 and the Utah average is 51.7.

What is the nearest substation to DEAD HEAD?

The nearest mapped substation is DEAD HEAD, about 0 miles away, at 69 kV. GridCensus catalogs 50 MW of candidate capacity for the site.

Which electric utility serves DEAD HEAD?

LEHI CITY CORPORATION (municipal) holds the retail service territory that contains the site.

What grid region is DEAD HEAD in?

DEAD HEAD is in the WECC region. Projects interconnecting there have averaged a 3.5-year wait from queue request to operation.

How far is DEAD HEAD from an internet exchange?

The nearest internet exchange facility is DataBank Salt Lake City (SLC2), about 5.1 miles away; 15 fiber providers report service at the location.

Related pages

About this data

Source: GridCensus composite of HIFLD transmission and substation data, EIA, FEMA National Risk Index, FCC broadband data, PeeringDB and ISO interconnection queues, as published October 10, 2026 — GridCensus refreshes it monthly. See the methodology for how records are matched, cleaned and scored.

Cite as: GridCensus, “DEAD HEAD, Salt Lake County, UT”, https://gridcensus.com/datacenter-sites/utah/salt-lake-county/dead-head-c30ca420 (data as of October 10, 2026).

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for DEAD HEAD, Salt Lake County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.