Cache County, Utah · WECC

DC Readiness
58.9
Good / 100

TAP209784 is a substation-adjacent datacenter candidate site in Cache County, Utah, interconnecting through WECC. It screens at 58.9/100 DC Readiness with a catalogued 300 MW of candidate capacity and a 6.9 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationTAP209784
Substation distance0.0 mi
Substation voltage230 kV
Available capacity300 MW

Speed to power

Interconnection outlookConstrained
≈ 6.9 yrs typical interconnection wait

Deep queue and long historical waits — plan for a multi-year interconnection timeline and engage the utility early.

ISO / RTO regionWECC
Queue depth34
Avg queue wait6.9 yrs

Connectivity

Nearest IXPLowest Host/Empire Technology
IXP distance73.0 mi
Fiber providers10
Fiber coverage38.5%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score85/100

Location context

Nearest datacenterFamily History Center
DC distance41.8 mi
County hazard (FEMA NRI)Relatively Low (15)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity9.77¢/kWh
Industrial electricity8.14¢/kWh
Cooling degree days1,000
Heating degree days5,500
Land price / acre$7,620

Regulatory climate

Moderatestate posture · as of 2026-08

No notable statewide DC restriction on record; confirm local zoning and utility tariffs.

DC tax incentiveNo / suspended

Incentive detail: Enterprise Zone tax credits; Economic Development Tax Increment Financing (EDTIF).

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track TAP209784

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
78
Speed to power20%
57
Fiber connectivity12%
61
Energy cost10%
50
Water risk7%
24
Natural hazard6%
85
Buildability7%
60
Labor market4%
50
DC cluster4%
40
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
75

Nearby comparable sites

Other scored datacenter candidate sites in Cache County, ranked by DC Readiness.

Sites near TAP209784
SiteTypeVoltageCapacityQueue waitScore
EC Near Logan CityGreenfield——1.7 yrs60.1
EC Near Logan CityGreenfield——1.7 yrs59.8
EC Near Logan CityGreenfield——1.7 yrs59.7
EC Near Logan CityGreenfield——1.7 yrs59.7
UNKNOWN201320Substation-Adjacent230 kV300 MW6.9 yrs59.0
UNKNOWN202633Substation-Adjacent230 kV300 MW6.9 yrs59.0
UNKNOWN206395Substation-Adjacent230 kV300 MW6.9 yrs59.0
UNKNOWN206233Substation-Adjacent230 kV300 MW6.9 yrs58.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for TAP209784, Cache County. Pro and Enterprise plans unlock the full 147,272-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.