Globe Building

Industrial

Wichita County, Texas · ERCOT

DC Readiness
45.5
Fair / 100

Globe Building is a industrial datacenter candidate site in Wichita County, Texas, interconnecting through ERCOT. It screens at 45.5/100 DC Readiness.

Power & interconnection

Speed to power

ISO / RTO regionERCOT
Queue depth876

Connectivity

Nearest IXPQTS Fort Worth (FTW1)
IXP distance119.7 mi

Site characteristics

Site typeIndustrial

Risk & environment

Water stress (WRI)Medium-High
Wetlands (NWI)
Critical habitat
Superfund nearby
Hazard sub-score50/100

Location context

Nearest datacenterDatacenter 747985149
DC distance23.2 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Cooling degree days2,600
Heating degree days1,800
Land price / acre$2,084

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
54
Fiber connectivity12%
54
Energy cost10%
50
Water risk8%
50
Natural hazard8%
50
Buildability7%
50
Labor market4%
50
DC cluster4%
60
Land / acreage3%
43
Construction cost3%
50
Gas pipeline2%
10
Tax incentive2%
0
Climate / cooling2%
50

Nearby comparable sites

Other scored datacenter candidate sites in Wichita County, ranked by DC Readiness.

Sites near Globe Building
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN309695Substation-Adjacent345 kV600 MW3.4 yrs69.6
UNKNOWN304596Substation-Adjacent138 kV100 MW3.4 yrs66.1
UNKNOWN306052Substation-Adjacent138 kV100 MW3.4 yrs65.6
Greenfield (UNKNOWN306791 - UNKNOWN300376)Greenfield345 kV600 MW3.4 yrs64.7
UNKNOWN300885Substation-Adjacent138 kV100 MW3.4 yrs64.6
Greenfield (UNKNOWN300376 - UNKNOWN304658)Greenfield345 kV600 MW3.4 yrs64.5
TAP305247Substation-Adjacent138 kV100 MW3.4 yrs64.5
UNKNOWN308509Substation-Adjacent138 kV100 MW3.4 yrs64.5

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for Globe Building, Wichita County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.