UNKNOWN306123

Substation-Adjacent

Titus County, Texas · SPP

DC Readiness
51.7
Fair / 100

UNKNOWN306123 is a substation-adjacent datacenter candidate site in Titus County, Texas, interconnecting through SPP. It screens at 51.7/100 DC Readiness with a catalogued 50 MW of candidate capacity and a 3.5 yrs average interconnection-queue wait.

Power & interconnection

Nearest substationUNKNOWN306123
Substation distance0.0 mi
Substation voltage69 kV
Available capacity50 MW
UtilityTEXAS-NEW MEXICO POWER COinvestor ownedfavorable to large load · terms ≥ 75 MWSB 6 large-load provisions (≥75 MW)

Speed to power

Interconnection outlookModerate
≈ 3.5 yrs typical interconnection wait

Middle-of-the-pack interconnection conditions for this grid.

ISO / RTO regionSPP
Queue depth46
Avg queue wait3.5 yrs
Recent queue wait3.5 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPARE-ON Hope
IXP distance82.2 mi
Fiber providers3
Fiber coverage69.4%

Site characteristics

Risk & environment

Environmental constraintNone (0/100)
Water stress (WRI)Medium-High
Wetlands (NWI)—
Critical habitat—
Superfund nearby—
Hazard sub-score45/100

Location context

Nearest datacenterARE-ON Hope
DC distance82.2 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity10.74¢/kWh
Industrial electricity6.96¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$3,394

Regulatory climate

Favorablestate posture · as of 2026-08

No statewide moratorium, but since Aug 3, 2026 ERCOT has paused approvals to energize new datacenter and crypto loads ≥75 MW pending an audit due Dec 10, 2026. SB 6 adds large-load obligations above 75 MW.

DC tax incentiveYes
Large-load threshold≥ 75 MW

SB 6: loads ≥75 MW accept ERCOT emergency curtailment + contribute to interconnection cost.

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Get alerts

Track UNKNOWN306123

Get an email when its DC-readiness score, available capacity, or interconnection-queue status changes.

No spam. Just the alerts you asked for.

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
46
Speed to power20%
67
Fiber connectivity12%
59
Energy cost10%
50
Water risk7%
44
Natural hazard6%
45
Buildability7%
60
Labor market4%
50
DC cluster4%
20
Land / acreage3%
51
Construction cost3%
50
Gas pipeline2%
10
Tax incentive1%
100
Climate / cooling1%
0

Nearby comparable sites

Other scored datacenter candidate sites in Titus County, ranked by DC Readiness.

Sites near UNKNOWN306123
SiteTypeVoltageCapacityQueue waitScore
EC FFE Titus CountyGreenfield——3.5 yrs58.5
EC Near MonticelloGreenfield——3.5 yrs58.3
EC Near WelshGreenfield——3.5 yrs58.0
EC Coal Titus CountyGreenfield——3.5 yrs57.6
EC Coal Titus CountyGreenfield——3.5 yrs57.4
EC Near WelshGreenfield——3.5 yrs57.4
EC Near MonticelloGreenfield——3.5 yrs57.4
EC Near WelshGreenfield——3.5 yrs57.4

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

Every site and score for UNKNOWN306123, Titus County is free to browse. Pro adds Watchtower on 25 sites, alerts when new candidate sites, datacenters or interconnection-queue requests appear in your markets, score and capacity history, and CSV export. Enterprise adds team seats, weekly data files for all 147,272 sites, the REST API and an MCP server for AI tools.