DC Readiness
61.0
Good / 100

EC FFE Somervell County is a greenfield datacenter candidate site in Somervell County, Texas, interconnecting through ERCOT. It screens at 61.0/100 DC Readiness and a 3.4 yrs average interconnection-queue wait.

Power & interconnection

LMP zoneERCOT_CENTRAL
Wholesale LMP$18.75/MWh
Utility commercial rate0.13¢/kWh

Speed to power

ISO / RTO regionERCOT
Queue depth8
Avg queue wait3.4 yrs
Recent queue wait3.1 yrs
Completion rate29%
Withdrawal rate71%

Connectivity

Nearest IXPAlpheus Fort Worth (307 W 7th St)
IXP distance44.8 mi
Fiber providers3
Fiber coverage62.1%
Nearest cloud providerGCP
Nearest cloud regionus-south1
Cloud region distance68.7 mi

Site characteristics

Site typeGreenfield
Land contactSomervell County County Assessor
Land owner typeprivate
Buildability92.0/100
Land cover (NLCD)Developed, Low Intensity
Former usefossil fuel employment

Risk & environment

Flood zoneZone X
Water stress (WRI)2.80
Wetlands (NWI)Clear
Critical habitatClear
Superfund nearbyClear
Hazard sub-score45/100
Construction cost index123.4 (avg 100)

Location context

Nearest datacenterMARA Data Center
DC distance8.6 mi
Nearest rail5.5 mi
Nearest gas pipeline0.5 mi
Nearest fiber route33.3 mi
County hazard (FEMA NRI)Very High (55)
DC tax incentiveYes (sales_tax_exemption)
Commercial electricity12.98¢/kWh
Industrial electricity7.84¢/kWh
Cooling degree days2,600
Heating degree days1,800
Land price / acre$4,819

Incentive detail: Chapter 313/Chapter 403 property tax abatements; Texas Enterprise Fund; no state income tax.

Site location

◆ Loading map…
≥ 7560–7540–60≤ 40
This site + 8 nearby

Full DC Readiness breakdown

All 13 weighted sub-scores (0–100) behind the composite DC Readiness score.

Power availability20%
30
Speed to power15%
69
Fiber connectivity12%
62
Energy cost10%
93
Water risk8%
64
Natural hazard8%
45
Buildability7%
92
Labor market4%
50
DC cluster4%
90
Land / acreage3%
59
Construction cost3%
47
Gas pipeline2%
99
Tax incentive2%
100
Climate / cooling2%
0

Nearby comparable sites

Other scored datacenter candidate sites in Somervell County, ranked by DC Readiness.

Sites near EC FFE Somervell County
SiteTypeVoltageCapacityQueue waitScore
UNKNOWN300502Substation-Adjacent345 kV600 MW1.7 yrs58.3
COMANCHE PEAKSubstation-Adjacent345 kV600 MW1.7 yrs57.5
OZ SomervellGreenfield3.4 yrs55.1
UNKNOWN309509Substation-Adjacent138 kV100 MW1.7 yrs51.7
UNKNOWN303200Substation-Adjacent138 kV100 MW1.7 yrs51.7
UNKNOWN308909Substation-Adjacent138 kV100 MW1.7 yrs51.7
Greenfield (COMANCHE PEAK - JOHNSON)Greenfield345 kV600 MW1.7 yrs51.2
UNKNOWN300781Substation-Adjacent138 kV100 MW1.7 yrs50.9

Dataset updated . Screening estimates derived from public data sources.

Figures are screening estimates derived from public infrastructure data. Catalogued capacity reflects theoretical candidate capacity, not deliverable or committed interconnection. Confirm all values with the utility, ISO, and on-the-ground due diligence.

Go deeper than the public screen

This page shows a public slice of the GridCensus dataset for EC FFE Somervell County, Somervell County. Pro and Enterprise plans unlock the full 164,098-site catalog, raw sub-scores, parcel ownership, interconnection-queue detail, saved searches, and programmatic API access.